Modelling and solving algorithm for two-stage scheduling of construction component manufacturing with machining and welding process
Published 2017 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
Modelling and solving algorithm for two-stage scheduling of construction component manufacturing with machining and welding process
Authors
Keywords
-
Journal
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume -, Issue -, Pages 1-13
Publisher
Informa UK Limited
Online
2017-07-07
DOI
10.1080/00207543.2017.1349949
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- A hybrid multi-objective grey wolf optimizer for dynamic scheduling in a real-world welding industry
- (2017) Chao Lu et al. ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE
- Extended GRASP for the job shop scheduling problem with total weighted tardiness objective
- (2017) C. Bierwirth et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- An effective multi-objective discrete grey wolf optimizer for a real-world scheduling problem in welding production
- (2016) Chao Lu et al. ADVANCES IN ENGINEERING SOFTWARE
- An improved harmony search based energy-efficient routing algorithm for wireless sensor networks
- (2016) Bing Zeng et al. APPLIED SOFT COMPUTING
- Parallel-identical-machine job-shop scheduling with different stage-dependent buffering requirements
- (2016) Shi Qiang Liu et al. COMPUTERS & OPERATIONS RESEARCH
- A study on local search neighborhoods for the job shop scheduling problem with total weighted tardiness objective
- (2016) J. Kuhpfahl et al. COMPUTERS & OPERATIONS RESEARCH
- An effective hybrid harmony search-based algorithm for solving multidimensional knapsack problems
- (2015) Biao Zhang et al. APPLIED SOFT COMPUTING
- An efficient heuristic for a two-stage assembly scheduling problem with batch setup times to minimize makespan
- (2015) Ching-Jong Liao et al. COMPUTERS & INDUSTRIAL ENGINEERING
- List scheduling and beam search methods for the flexible job shop scheduling problem with sequencing flexibility
- (2015) E.G. Birgin et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Mixed graph model and algorithms for parallel-machine job-shop scheduling problems
- (2015) Yuri N. Sotskov et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- An effective discrete harmony search algorithm for flexible job shop scheduling problem with fuzzy processing time
- (2015) Kai Zhou Gao et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Pareto-based grouping discrete harmony search algorithm for multi-objective flexible job shop scheduling
- (2014) K.Z. Gao et al. INFORMATION SCIENCES
- A hybrid electromagnetism-like algorithm for two-stage assembly flow shop scheduling problem
- (2014) Hong-Sen Yan et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- The two stage assembly flowshop scheduling problem to minimize total tardiness
- (2013) Ali Allahverdi et al. JOURNAL OF INTELLIGENT MANUFACTURING
- An artificial immune system heuristic for two-stage multi-machine assembly scheduling problem to minimize total completion time
- (2013) Fawaz S. Al-Anzi et al. JOURNAL OF MANUFACTURING SYSTEMS
- A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect
- (2012) Nima Hamta et al. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
- Two-stage production scheduling with an outsourcing option
- (2011) Kangbok Lee et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- A local-best harmony search algorithm with dynamic sub-harmony memories for lot-streaming flow shop scheduling problem
- (2010) Quan-Ke Pan et al. EXPERT SYSTEMS WITH APPLICATIONS
- The two-stage assembly scheduling problem to minimize total completion time with setup times
- (2008) Ali Allahverdi et al. COMPUTERS & OPERATIONS RESEARCH
- Scheduling job shop problems with sequence-dependent setup times
- (2008) B. Naderi et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Global-best harmony search
- (2007) Mahamed G.H. Omran et al. APPLIED MATHEMATICS AND COMPUTATION
- A very fast TS/SA algorithm for the job shop scheduling problem
- (2006) Chao Yong Zhang et al. COMPUTERS & OPERATIONS RESEARCH
- Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
- (2006) Carlos Andrés et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
Publish scientific posters with Peeref
Peeref publishes scientific posters from all research disciplines. Our Diamond Open Access policy means free access to content and no publication fees for authors.
Learn MoreAdd your recorded webinar
Do you already have a recorded webinar? Grow your audience and get more views by easily listing your recording on Peeref.
Upload Now