The two stage assembly flowshop scheduling problem to minimize total tardiness
Published 2013 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
The two stage assembly flowshop scheduling problem to minimize total tardiness
Authors
Keywords
Scheduling, Assembly flowshop, Total tardiness, Algorithm, Insertion, Simulated annealing, Cloud theory-based simulated annealing, Genetic
Journal
JOURNAL OF INTELLIGENT MANUFACTURING
Volume 26, Issue 2, Pages 225-237
Publisher
Springer Nature
Online
2013-04-20
DOI
10.1007/s10845-013-0775-5
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- Heuristics for no-wait flowshops with makespan subject to mean completion time
- (2012) Harun Aydilek et al. APPLIED MATHEMATICS AND COMPUTATION
- Online scheduling of flexible job-shops with blocking and transportation
- (2012) Jens Poppenborg et al. European Journal of Industrial Engineering
- Permutation flowshops in group scheduling with sequence-dependent setup times
- (2012) B. Naderi et al. European Journal of Industrial Engineering
- Minimising makespan for multistage hybrid flowshop scheduling problems with multiprocessor tasks by a hybrid immune algorithm
- (2012) Kuo Ching Ying European Journal of Industrial Engineering
- Resolution of the two-part cyclic hoist scheduling problem with bounded processing times in complex lines' configuration
- (2012) Adnen El Amraoui et al. European Journal of Industrial Engineering
- Solving the single machine scheduling problem with general job-dependent past-sequence-dependent setup times and learning effects
- (2012) H.M. Soroush European Journal of Industrial Engineering
- Scheduling a bi-criteria flowshop manufacturing cell with sequence-dependent family setup times
- (2012) Shih Wei Lin et al. European Journal of Industrial Engineering
- A hybrid PSO-SA algorithm for the travelling tournament problem
- (2012) Alireza Tajbakhsh et al. European Journal of Industrial Engineering
- Flexible job shop scheduling with parallel machines using Genetic Algorithm and Grouping Genetic Algorithm
- (2012) James C. Chen et al. EXPERT SYSTEMS WITH APPLICATIONS
- A new genetic algorithm for lot-streaming flow shop scheduling with limited capacity buffers
- (2012) José A. Ventura et al. JOURNAL OF INTELLIGENT MANUFACTURING
- Genetic algorithm for rotary machine scheduling with dependent processing times
- (2011) Jing Huang et al. JOURNAL OF INTELLIGENT MANUFACTURING
- Minimizing the total completion time in a two-machine flowshop with sequence-independent setup times
- (2011) T Ladhari et al. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
- Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop
- (2010) E. Torabzadeh et al. ADVANCES IN ENGINEERING SOFTWARE
- A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem
- (2010) E. Shokrollahpour et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- A genetic algorithm with genes-association recognition for flowshop scheduling problems
- (2010) C. Sauvey et al. JOURNAL OF INTELLIGENT MANUFACTURING
- Makespan minimization for scheduling unrelated parallel machines with setup times
- (2010) Kuo-Ching Ying et al. JOURNAL OF INTELLIGENT MANUFACTURING
- A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times
- (2010) H. S. Mirsanei et al. JOURNAL OF INTELLIGENT MANUFACTURING
- Ant colony optimization algorithm for a Bi-criteria 2-stage hybrid flowshop scheduling problem
- (2009) Elyn L. Solano-Charris et al. JOURNAL OF INTELLIGENT MANUFACTURING
- Genetic algorithms with path relinking for the minimum tardiness permutation flowshop problem☆
- (2009) Eva Vallada et al. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
- The two-stage assembly scheduling problem to minimize total completion time with setup times
- (2008) Ali Allahverdi et al. COMPUTERS & OPERATIONS RESEARCH
- Total tardiness minimization in permutation flow shops: a simple approach based on a variable greedy algorithm
- (2008) J. M. Framinan et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times
- (2008) V. Vinod et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Minimising total tardiness in the m-machine flowshop problem: A review and evaluation of heuristics and metaheuristics
- (2006) Eva Vallada et al. COMPUTERS & OPERATIONS RESEARCH
- The significance of reducing setup times/setup costs
- (2006) Ali Allahverdi et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- A survey of scheduling problems with setup times or costs
- (2006) Ali Allahverdi et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
Discover Peeref hubs
Discuss science. Find collaborators. Network.
Join a conversationBecome a Peeref-certified reviewer
The Peeref Institute provides free reviewer training that teaches the core competencies of the academic peer review process.
Get Started