Assembly HVDC Breaker for HVDC Grids With Modular Multilevel Converters

Journal

IEEE TRANSACTIONS ON POWER ELECTRONICS
Volume 32, Issue 2, Pages 931-941

Publisher

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPEL.2016.2540808

Keywords

Assembly high-voltage direct current (HVDC) breaker; dc fault clearance solution; half-bridge modular multilevel converter (MMC); HVDC grid with overhead lines; MMC

Funding

  1. Headquarters Research Projects of State Grid Corporation of China [SGCC-HRP031-2015]

Ask authors/readers for more resources

The modular multilevel converter (MMC) with half-bridge submodules (SMs) is the most promising technology for high-voltage direct current (HVDC) grids, but it lacks dc fault clearance capability. There are two main methods to handle the dc-side short-circuit fault. One is to employ the SMs that have dc fault clearance capability, but the power losses are high and the converter has to be blocked during the clearance. The other is to employ the hybrid HVDC breakers. The breaker is capable of interrupting fault current within 5 ms, but this technology is not cost effective, especially in meshed HVDC grids. In this paper, an assembly HVDC breaker and the corresponding control strategy are proposed to overcome these drawbacks. The assembly HVDC breaker consists of an active short-circuit breaker (ASCB), a main mechanical disconnector, a main breaker, and an accessory discharging switch (ADS). When a dc-side short-circuit fault occurs, the ASCB and the ADS close immediately to shunt the fault current. The main breaker opens after a short delay to isolate the faulted line from the system and then the mechanical disconnector opens. With the disconnector in open position, the ASCB opens and breaks the current. The proposed breaker can handle the dc-side fault with competitively low cost, and the operating speed is fast enough. A model of a four-terminal monopolar HVDC grid is developed in Power Systems Computer Aided Design / Electromagnetic Transients including DC, and the simulation result proves the validity and the feasibility of the proposed solution.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.8
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available