4.5 Article

A disruption recovery plan in a three-stage production-inventory system

Journal

COMPUTERS & OPERATIONS RESEARCH
Volume 57, Issue -, Pages 60-72

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cor.2014.12.003

Keywords

Production-inventory system; Disruption recovery; Mixed-production environment; Heuristic; Pattern search

Ask authors/readers for more resources

This paper proposes a recovery plan for managing disruptions in a three-stage production-inventory system under a mixed production environment. First, a mathematical model is developed to deal with a disruption at any stage while maximizing total profit during the recovery-time window. The model is solved after the occurrence of a disruption event, with changed data used to generate a revised plan. We also propose a new and efficient heuristic for solving the developed mathematical model. Second, multiple disruptions are considered, where a new disruption may or may not affect the recovery plans of earlier disruptions. The heuristic, developed for a single disruption, is extended to deal with a series of disruptions so that it can be implemented for disruption recovery on a real-time basis. We compare the heuristic solutions with those obtained by a standard search algorithm for a set of randomly generated disruption test problems, and that show the consistent performance of our developed heuristic with lower computational times. Finally, some numerical examples and a real-world case study are presented to demonstrate the benefits and usefulness of our proposed approach. (C) 2014 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available