4.5 Article

A disruption recovery plan in a three-stage production-inventory system

期刊

COMPUTERS & OPERATIONS RESEARCH
卷 57, 期 -, 页码 60-72

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cor.2014.12.003

关键词

Production-inventory system; Disruption recovery; Mixed-production environment; Heuristic; Pattern search

向作者/读者索取更多资源

This paper proposes a recovery plan for managing disruptions in a three-stage production-inventory system under a mixed production environment. First, a mathematical model is developed to deal with a disruption at any stage while maximizing total profit during the recovery-time window. The model is solved after the occurrence of a disruption event, with changed data used to generate a revised plan. We also propose a new and efficient heuristic for solving the developed mathematical model. Second, multiple disruptions are considered, where a new disruption may or may not affect the recovery plans of earlier disruptions. The heuristic, developed for a single disruption, is extended to deal with a series of disruptions so that it can be implemented for disruption recovery on a real-time basis. We compare the heuristic solutions with those obtained by a standard search algorithm for a set of randomly generated disruption test problems, and that show the consistent performance of our developed heuristic with lower computational times. Finally, some numerical examples and a real-world case study are presented to demonstrate the benefits and usefulness of our proposed approach. (C) 2014 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据