4.7 Article

Operations scheduling of waste-to-energy plants under uncertainty

Journal

JOURNAL OF CLEANER PRODUCTION
Volume 253, Issue -, Pages -

Publisher

ELSEVIER SCI LTD
DOI: 10.1016/j.jclepro.2019.119953

Keywords

Waste-to-energy; Operations scheduling; Robust optimization; Uncertainty

Funding

  1. National Research Foundation
  2. Prime Minister's Office of Singapore under its Campus for Research Excellence and Technological Enterprise (CREATE) program

Ask authors/readers for more resources

Waste-to-energy (WTE) technologies provide effective solutions to the compelling challenges of waste management and the energy crisis globally. Many WTE plants utilize the combined heat and power (CHP) operation mode where both electricity and heat can be generated simultaneously. Thus, these WTE CHP plants can supply heat to the local district heating systems and trade power in the electricity markets. As such plants have the responsibilities of treating waste and of fulfilling the allocated district heating demand, necessary operational tasks such as preventive maintenance actions for the production units should be scheduled and performed periodically to ensure their continuous and reliable operations. This paper studies the scheduling of operational tasks in WTE CHP plants that participate in electricity markets and are connected to district heating networks. Firstly, we formulate a two-stage robust optimization model considering the uncertainty of electricity market prices, heat demand, and waste supply. The objective is to derive the robust optimal schedule that maximizes the worst-case operating profit of a WTE CHP plant under uncertainty. Subsequently, we design a constraint generation algorithm for the two-stage robust optimization model. Finally, a case study of scheduling preventive maintenance tasks is conducted for the production units of a WTE CHP plant over a 30-day horizon. The robust schedule thus derived is evaluated by Monte Carlo simulation tests and further compared to the deterministic schedule generated without the consideration of uncertainty. The simulation results show that the robust schedule enables an average profit of 877021.21(sic) to be attained for the plant over the scheduling horizon. Moreover, it improves the robustness of its deterministic counterpart from 68.4% to 98.8% with an increase of only 0.3% of the operating profit of the plant. In addition, a comprehensive sensitivity analysis is performed to investigate the impacts of different types of uncertainty on the robust schedule for the WTE CHP plant. (C) 2020 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available