A two-stage stochastic programming for single yard crane scheduling with uncertain release times of retrieval tasks
Published 2018 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
A two-stage stochastic programming for single yard crane scheduling with uncertain release times of retrieval tasks
Authors
Keywords
-
Journal
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume -, Issue -, Pages 1-16
Publisher
Informa UK Limited
Online
2018-09-15
DOI
10.1080/00207543.2018.1516903
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- A simulation study of the performance of twin automated stacking cranes at a seaport container terminal
- (2017) Amir Hossein Gharehgozli et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- On the quality of simple measures predicting block relocations in container yards
- (2017) Joachim Scholl et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Maintenance Appointments in Railway Rolling Stock Rescheduling
- (2017) Joris C. Wagenaar et al. TRANSPORTATION SCIENCE
- Behavior perception-based disruption models for berth allocation and quay crane assignment problems
- (2016) Changchun Liu et al. COMPUTERS & INDUSTRIAL ENGINEERING
- Crane scheduling problem with non-interference constraints in a steel coil distribution centre
- (2016) Gabriela N. Maschietto et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Bi-objective optimization for the container terminal integrated planning
- (2016) Ming Liu et al. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL
- A multi-level Taguchi-factorial two-stage stochastic programming approach for characterization of parameter uncertainties and their interactions: An application to water resources management
- (2015) S. Wang et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Scheduling Multiple Yard Cranes with Crane Interference and Safety Distance Requirement
- (2015) Yong Wu et al. TRANSPORTATION SCIENCE
- Scheduling Twin Yard Cranes in a Container Block
- (2015) Amir Hossein Gharehgozli et al. TRANSPORTATION SCIENCE
- Simulation-based rescheduling of the stacker–reclaimer operation
- (2015) Teus van Vianen et al. Journal of Computational Science
- An inexact mixed risk-aversion two-stage stochastic programming model for water resources management under uncertainty
- (2014) W. Li et al. ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH
- A decision-tree stacking heuristic minimising the expected number of reshuffles at a container terminal
- (2013) Amir Hossein Gharehgozli et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Two-stage stochastic bilevel programming over a transportation network
- (2013) S.M. Alizadeh et al. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL
- A bi-objective model for robust berth allocation scheduling
- (2012) Lu Zhen et al. COMPUTERS & INDUSTRIAL ENGINEERING
- Rescheduling for new orders on a single machine with setup times
- (2012) H. Hoogeveen et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Dynamic yard crane dispatching in container terminals with predicted vehicle arrival information
- (2011) Xi Guo et al. ADVANCED ENGINEERING INFORMATICS
- Genetic algorithms for match-up rescheduling of the flexible manufacturing systems
- (2011) Zalmiyah Zakaria et al. COMPUTERS & INDUSTRIAL ENGINEERING
- A decision model for berth allocation under uncertainty
- (2011) Lu Zhen et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- SAPI: Statistical Analysis of Propagation of Incidents. A new approach for rescheduling trains after disruptions
- (2011) Rodrigo Acuna-Agost et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Dynamic Space and Time Partitioning for Yard Crane Workload Management in Container Terminals
- (2011) Xi Guo et al. TRANSPORTATION SCIENCE
- Rescheduling rail networks with maintenance disruptions using Problem Space Search
- (2010) A.R. Albrecht et al. COMPUTERS & OPERATIONS RESEARCH
- A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time
- (2010) Xiao-le Han et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- FMS scheduling with knowledge based genetic algorithm approach
- (2010) A. Prakash et al. EXPERT SYSTEMS WITH APPLICATIONS
- Sequencing Two Cooperating Automated Stacking Cranes in a Container Terminal
- (2010) Iris F. A. Vis et al. TRANSPORTATION SCIENCE
- Inexact Two-Stage Stochastic Robust Optimization Model for Water Resources Management Under Uncertainty
- (2009) Ye Xu et al. ENVIRONMENTAL ENGINEERING SCIENCE
- Optimising the Slab Yard Planning and Crane Scheduling Problem using a two-stage heuristic
- (2009) Anders Dohn et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Sample Average Approximation Method for Chance Constrained Programming: Theory and Applications
- (2009) B. K. Pagnoncelli et al. JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS
- A two-stage stochastic programming model for transportation network protection
- (2008) Changzheng Liu et al. COMPUTERS & OPERATIONS RESEARCH
- Discrete time model and algorithms for container yard crane scheduling
- (2008) Wenkai Li et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Sample average approximation of expected value constrained stochastic programs
- (2008) Wei Wang et al. OPERATIONS RESEARCH LETTERS
- A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems
- (2007) Jie Gao et al. COMPUTERS & OPERATIONS RESEARCH
Discover Peeref hubs
Discuss science. Find collaborators. Network.
Join a conversationCreate your own webinar
Interested in hosting your own webinar? Check the schedule and propose your idea to the Peeref Content Team.
Create Now