Scheduling of unrelated parallel machines with limited server availability on multiple production locations: a case study in knitted fabrics
Published 2013 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
Scheduling of unrelated parallel machines with limited server availability on multiple production locations: a case study in knitted fabrics
Authors
Keywords
-
Journal
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume 52, Issue 9, Pages 2630-2653
Publisher
Informa UK Limited
Online
2013-12-07
DOI
10.1080/00207543.2013.865855
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- An Improved Genetic-Simulated Annealing Algorithm Based on a Hormone Modulation Mechanism for a Flexible Flow-Shop Scheduling Problem
- (2013) Min Dai et al. Advances in Mechanical Engineering
- A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups
- (2012) Veronique Sels et al. COMPUTERS & OPERATIONS RESEARCH
- The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine
- (2012) J. Behnamian et al. INFORMATION SCIENCES
- MIP models and hybrid algorithm for minimizing the makespan of parallel machines scheduling problem with a single server
- (2011) Mi-Yi Kim et al. COMPUTERS & OPERATIONS RESEARCH
- A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times
- (2011) Eva Vallada et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Scheduling with multiple servers
- (2010) F. Werner et al. AUTOMATION AND REMOTE CONTROL
- Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates
- (2010) Shih-Wei Lin et al. COMPUTERS & OPERATIONS RESEARCH
- Iterated greedy local search methods for unrelated parallel machine scheduling
- (2010) Luis Fanjul-Peyro et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Parallel dedicated machine scheduling problem with sequence-dependent setups and a single server
- (2009) Simin Huang et al. COMPUTERS & INDUSTRIAL ENGINEERING
- Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints
- (2009) R. Tavakkoli-Moghaddam et al. COMPUTERS & OPERATIONS RESEARCH
- Dynamic parallel machine scheduling with sequence-dependent setup times using an iterated greedy heuristic
- (2009) Kuo-Ching Ying et al. EXPERT SYSTEMS WITH APPLICATIONS
- A two-stage Ant Colony Optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times
- (2009) Jean-Paul Arnaout et al. JOURNAL OF INTELLIGENT MANUFACTURING
- Parallel machine scheduling with multiple unloading servers
- (2009) Jinwen Ou et al. JOURNAL OF SCHEDULING
- Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm
- (2008) J. Behnamian et al. EXPERT SYSTEMS WITH APPLICATIONS
- Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times
- (2006) Pedro Leite Rocha et al. COMPUTERS & OPERATIONS RESEARCH
- A survey of scheduling problems with setup times or costs
- (2006) Ali Allahverdi et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
Create your own webinar
Interested in hosting your own webinar? Check the schedule and propose your idea to the Peeref Content Team.
Create NowAsk a Question. Answer a Question.
Quickly pose questions to the entire community. Debate answers and get clarity on the most important issues facing researchers.
Get Started