Scheduling of unrelated parallel machines with limited server availability on multiple production locations: a case study in knitted fabrics
出版年份 2013 全文链接
标题
Scheduling of unrelated parallel machines with limited server availability on multiple production locations: a case study in knitted fabrics
作者
关键词
-
出版物
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume 52, Issue 9, Pages 2630-2653
出版商
Informa UK Limited
发表日期
2013-12-07
DOI
10.1080/00207543.2013.865855
参考文献
相关参考文献
注意:仅列出部分参考文献,下载原文获取全部文献信息。- An Improved Genetic-Simulated Annealing Algorithm Based on a Hormone Modulation Mechanism for a Flexible Flow-Shop Scheduling Problem
- (2013) Min Dai et al. Advances in Mechanical Engineering
- A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups
- (2012) Veronique Sels et al. COMPUTERS & OPERATIONS RESEARCH
- The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine
- (2012) J. Behnamian et al. INFORMATION SCIENCES
- MIP models and hybrid algorithm for minimizing the makespan of parallel machines scheduling problem with a single server
- (2011) Mi-Yi Kim et al. COMPUTERS & OPERATIONS RESEARCH
- A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times
- (2011) Eva Vallada et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Scheduling with multiple servers
- (2010) F. Werner et al. AUTOMATION AND REMOTE CONTROL
- Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates
- (2010) Shih-Wei Lin et al. COMPUTERS & OPERATIONS RESEARCH
- Iterated greedy local search methods for unrelated parallel machine scheduling
- (2010) Luis Fanjul-Peyro et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Parallel dedicated machine scheduling problem with sequence-dependent setups and a single server
- (2009) Simin Huang et al. COMPUTERS & INDUSTRIAL ENGINEERING
- Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints
- (2009) R. Tavakkoli-Moghaddam et al. COMPUTERS & OPERATIONS RESEARCH
- Dynamic parallel machine scheduling with sequence-dependent setup times using an iterated greedy heuristic
- (2009) Kuo-Ching Ying et al. EXPERT SYSTEMS WITH APPLICATIONS
- A two-stage Ant Colony Optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times
- (2009) Jean-Paul Arnaout et al. JOURNAL OF INTELLIGENT MANUFACTURING
- Parallel machine scheduling with multiple unloading servers
- (2009) Jinwen Ou et al. JOURNAL OF SCHEDULING
- Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm
- (2008) J. Behnamian et al. EXPERT SYSTEMS WITH APPLICATIONS
- Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times
- (2006) Pedro Leite Rocha et al. COMPUTERS & OPERATIONS RESEARCH
- A survey of scheduling problems with setup times or costs
- (2006) Ali Allahverdi et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
Discover Peeref hubs
Discuss science. Find collaborators. Network.
Join a conversationAsk a Question. Answer a Question.
Quickly pose questions to the entire community. Debate answers and get clarity on the most important issues facing researchers.
Get Started