Solving a new fuzzy multi-objective model for a multi-skilled manpower scheduling problem by particle swarm optimization and elite tabu search
Published 2012 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
Solving a new fuzzy multi-objective model for a multi-skilled manpower scheduling problem by particle swarm optimization and elite tabu search
Authors
Keywords
Multi-skilled manpower scheduling, Multi-objective model, Fuzzy goal programming, Particle swarm optimization, Elite tabu search
Journal
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
Volume 64, Issue 9-12, Pages 1517-1540
Publisher
Springer Nature
Online
2012-05-15
DOI
10.1007/s00170-012-4119-y
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- A tabu search algorithm for order acceptance and scheduling
- (2010) Bahriye Cesaret et al. COMPUTERS & OPERATIONS RESEARCH
- An efficient bi-objective personnel assignment algorithm based on a hybrid particle swarm optimization model
- (2010) Shih-Ying Lin et al. EXPERT SYSTEMS WITH APPLICATIONS
- Applying fuzzy goal programming to project management decisions with multiple goals in uncertain environments
- (2010) Tien-Fu Liang EXPERT SYSTEMS WITH APPLICATIONS
- A hybrid particle swarm optimization for a university course scheduling problem with flexible preferences
- (2010) Der-Fang Shiau EXPERT SYSTEMS WITH APPLICATIONS
- Solving a multi-objective job shop scheduling problem with sequence-dependent setup times by a Pareto archive PSO combined with genetic operators and VNS
- (2010) Reza Tavakkoli-Moghaddam et al. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
- A Pareto approach to multi-objective flexible job-shop scheduling problem using particle swarm optimization and local search
- (2010) Ghasem Moslehi et al. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
- Solving multi-level multi-objective linear programming problems through fuzzy goal programming approach
- (2009) Ibrahim A. Baky APPLIED MATHEMATICAL MODELLING
- Fuzzy multi-objective project management decisions using two-phase fuzzy goal programming approach
- (2009) Tien-Fu Liang COMPUTERS & INDUSTRIAL ENGINEERING
- A tabu-search algorithm for scheduling jobs with controllable processing times on a single machine to meet due-dates
- (2009) Kailiang Xu et al. COMPUTERS & OPERATIONS RESEARCH
- An iterative approach to robust and integrated aircraft routing and crew scheduling
- (2009) Oliver Weide et al. COMPUTERS & OPERATIONS RESEARCH
- Combining integer programming and the randomization method to schedule employees
- (2009) Armann Ingolfsson et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Optimizing daily agent scheduling in a multiskill call center
- (2009) Athanassios N. Avramidis et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB
- (2009) Ruey-Maw Chen et al. EXPERT SYSTEMS WITH APPLICATIONS
- Fuzzy goal programming algorithm for solving decentralized bi-level multi-objective programming problems
- (2009) Ibrahim A. Baky FUZZY SETS AND SYSTEMS
- A scatter search methodology for the nurse rostering problem
- (2009) E K Burke et al. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
- A fuzzy-mixed-integer goal programming model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates
- (2009) A.H. Gharehgozli et al. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING
- Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time
- (2008) Qun Niu et al. APPLIED MATHEMATICS AND COMPUTATION
- A fuzzy multi-criteria decision making approach for solving a bi-objective personnel assignment problem
- (2008) Deng Kui Huang et al. COMPUTERS & INDUSTRIAL ENGINEERING
- Medical doctor rostering problem in a hospital emergency department by means of genetic algorithms
- (2008) Javier Puente et al. COMPUTERS & INDUSTRIAL ENGINEERING
- Multiple-criteria decision-making in two-sided assembly line balancing: A goal programming and a fuzzy goal programming models
- (2008) Uğur Özcan et al. COMPUTERS & OPERATIONS RESEARCH
- Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound
- (2008) Christian Artigues et al. COMPUTERS & OPERATIONS RESEARCH
- A shift scheduling model for employees with different seniority levels and an application in healthcare
- (2008) Seyda Topaloglu EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Binary fuzzy goal programming approach to single model straight and U-shaped assembly line balancing
- (2008) Yakup Kara et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Developing work schedules for an inter-city transit system with multiple driver types and fleet types
- (2008) Renato de Matta et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Scheduling part-time personnel with availability restrictions and preferences to maximize employee satisfaction
- (2008) Srimathy Mohan MATHEMATICAL AND COMPUTER MODELLING
- An effective hybrid PSO-based algorithm for flow shop scheduling with limited buffers
- (2007) Bo Liu et al. COMPUTERS & OPERATIONS RESEARCH
- Skilled workforce scheduling in Service Centres
- (2007) Vicente Valls et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Interactive fuzzy goal programming approach for bilevel programming problem
- (2007) S.R. Arora et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
Publish scientific posters with Peeref
Peeref publishes scientific posters from all research disciplines. Our Diamond Open Access policy means free access to content and no publication fees for authors.
Learn MoreAsk a Question. Answer a Question.
Quickly pose questions to the entire community. Debate answers and get clarity on the most important issues facing researchers.
Get Started