4.7 Article

Applying fuzzy goal programming to project management decisions with multiple goals in uncertain environments

Journal

EXPERT SYSTEMS WITH APPLICATIONS
Volume 37, Issue 12, Pages 8499-8507

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.eswa.2010.05.026

Keywords

Project management; Multi-objective linear programming; Fuzzy sets; Fuzzy goal programming

Ask authors/readers for more resources

In real-life situations, the project manager must handle multiple conflicting goals and these conflicting goals are normally fuzzy owing to information is incomplete and unavailable. This study develops a two-phase fuzzy goal programming (FGP) method for solving the project management (PM) decision problems with multiple goals in uncertain environments. The original multi-objective linear programming (MOLP) model designed here attempts to simultaneously minimize total project costs, total completion time and total crashing costs with reference to direct costs, indirect and contractual penalty costs, duration of activities and the constraint of available budget. An industrial case is implemented to demonstrate the feasibility of applying the proposed two-phase FGP method to practical PM decisions. The contribution of this study lies in presenting a fuzzy mathematical programming methodology to fuzzy multi-objective PM decisions, and provides a systematic decision-making framework that facilitates the decision maker to interactively adjust the search direction until the preferred efficient solution is obtained. (C) 2010 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available