4.6 Article

A resource type analysis of the integrated project scheduling and personnel staffing problem

Journal

ANNALS OF OPERATIONS RESEARCH
Volume 252, Issue 2, Pages 407-433

Publisher

SPRINGER
DOI: 10.1007/s10479-015-2033-z

Keywords

Manpower planning; Project scheduling; Cyclic scheduling; Non-cyclic scheduling

Funding

  1. Fonds Wetenschappelijk Onderzoek Vlaanderen (FWO), Belgium [G015711N]

Ask authors/readers for more resources

In the integrated project scheduling and personnel staffing problem the project activities are scheduled and simultaneously a staffing plan is composed to carry out a single project. In this way, the project schedule that leads to the staffing plan with minimum cost is determined. In this paper, we evaluate different scheduling policies and practices for different personnel resource types. We examine the impact on the staffing cost when the personnel resources are scheduled in a cyclic versus a non-cyclic manner for different (days on, days off)-patterns. Furthermore, the impact of introducing more flexible resource types, such as overtime and temporary help, is explored in relationship with the activity resource demand variability. Computational results show that non-cyclic scheduling leads to a considerable lower staffing cost under all circumstances compared to cyclic scheduling. However, despite the tractability of the resource requirements, flexible temporary resources are essential on top of the regular personnel resources to respond to the variability in demand. The addition of overtime on a strategic staffing level only marginally decreases the personnel cost.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available