4.5 Article

SULTAN test facility: Summary of recent results

Journal

FUSION ENGINEERING AND DESIGN
Volume 88, Issue 5, Pages 282-285

Publisher

ELSEVIER SCIENCE SA
DOI: 10.1016/j.fusengdes.2013.02.133

Keywords

ITER; Cable-in-conduit conductor; SULTAN test facility; Tests and results; Cyclic loading

Ask authors/readers for more resources

The test campaigns of the ITER conductors in the SULTAN test facility re-started in December 2011 after three months break. The main focus of the activities is about the qualification tests of the Central Solenoid (CS) conductors, with three different samples for a total six variations of strand suppliers and cable layouts. In 2012, five Toroidal Field (TF) conductor samples have also been tested as part of the supplier and process qualification phase of the European, Korean, Chinese and Russian Federation Agencies. A summary of the test results for all the ITER samples tested in the last period is presented, including an updated statistics of the broad transition, the performance degradation and the impact of layout variations. The role of SULTAN test facility during the ITER construction is reviewed, and the load of work for the next three years is anticipated. (c) 2013 Elsevier B.V. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available