4.7 Article

A neuro-fuzzy model for a new hybrid integrated Process Planning and Scheduling system

Journal

EXPERT SYSTEMS WITH APPLICATIONS
Volume 40, Issue 13, Pages 5341-5351

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.eswa.2013.03.043

Keywords

Process Planning; Genetic Algorithm; Scheduling; Fuzzy Neural Network

Ask authors/readers for more resources

In customized mass production, isolation of Process Planning (PP) and Scheduling stages has a critical effect on the efficiency of production. In this study, to overcome this isolation problem, we propose an integrated system that does PP and Scheduling in parallel and responds to fluctuations in job floor on time. One common problem observed in integration models is the increase in computational time in conjunction with the increase of problem size. Therefore in this study, we use a hybrid heuristic model combining both Genetic Algorithm (GA) and Fuzzy Neural Network (FNN). To improve GA performance and increase the efficiency of searching, we use a clustered chromosome structure and test the performance of GA with respect to different scenarios. Data provided by GA is used in constructing an FNN model that instantly provides new schedules as new constraints emerge in the production environment. Introduction of fuzzy membership functions in Artificial Neural Network (ANN) model allows us to generate fuzzy rules for production environment. (c) 2013 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available