Journal
EXPERT SYSTEMS WITH APPLICATIONS
Volume 37, Issue 3, Pages 2661-2669Publisher
PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.eswa.2009.08.012
Keywords
Group scheduling; CMS; Makespan; Tardiness; Sequence-dependent setup cost; Scatter search
Categories
Funding
- University of Tehran [8106043/1/10]
Ask authors/readers for more resources
This paper considers a group scheduling problem for manufacturing cells, in which parts may visit different cells. By addressing intra-cell scheduling, the sequence of parts within manufacturing cells is determined; however, in inter-cell scheduling the sequence of cells is obtained. We present a new mathematical model for a multi-criteria group scheduling problem in a cellular manufacture system (CMS). The main objective is to minimize the makespan, intracellular movement, tardiness, and sequence-dependent setup costs, simultaneously. Due the complexity to solve this problem, we develop a meta-heuristic algorithm based on scatter search (SS). This algorithm is evaluated and the related results confirm the efficiency and the effectiveness of our proposed SS to provide good solutions, especially for medium and large-sized problems. (C) 2009 Elsevier Ltd. All rights reserved.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available