4.5 Article

Disruption recovery model for berth and quay crane scheduling in container terminals

Journal

ENGINEERING OPTIMIZATION
Volume 43, Issue 9, Pages 967-983

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/0305215X.2010.528411

Keywords

container terminals; berth allocation; quay crane scheduling; disruption management

Funding

  1. National Natural Science Funds of China for Distinguished Young Scholars [70725004]
  2. National Natural Science Foundation of China [71001012, 70890080, 70890083, 70671014]
  3. Ph.D. program Foundation of Ministry of Education of China [20092125120001]
  4. Fundamental Research Funds for the Central Universities [2009QN079]

Ask authors/readers for more resources

This article addresses the problem of recovering berth and quay crane (QC) schedules in container terminals when disruptions occur after a subset of operations has been processed. Firstly, models for simultaneous optimization of berth and QC schedules are developed. Then, two strategies, namely, QC rescheduling strategy and berth reallocation strategy are proposed to tackle disruptions and recover the berth and QC schedule, and models for the two strategies are developed respectively. To solve the disruption recovery models, algorithms based on local rescheduling and tabu search are designed. Finally, numerical experiments are provided to illustrate the validity of the proposed model and algorithms.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available