4.7 Article

Numerical analysis of the causes of face slab cracks in Gongboxia rockfill dam

Journal

ENGINEERING GEOLOGY
Volume 181, Issue -, Pages 224-232

Publisher

ELSEVIER SCIENCE BV
DOI: 10.1016/j.enggeo.2014.07.019

Keywords

concrete face rockfill dam (CFRD); concrete slab crack; structure-induced stress; temperature-induced stress; FEM

Ask authors/readers for more resources

There are face slab cracks on the Gongboxia concrete face rockfill dam (CFRD), which is located on the Yellow River in China. They generally occur as vertical cracks at the top of the panel near the water level. The region where Gongboxia CFRD is located is subjected to low temperatures during the winter months and high temperatures during the summer months. Also, this region experiences large temperature fluctuations during the day and night. In this study, the causes of crack formation in the face slabs of the dam are numerically analyzed from the perspective of structural- and temperature-induced stresses. The results show that temperature-induced stress is the main reason for the slab cracks on the Gongboxia CFRD; the structure-induced stresses lead to more cracks in the steep dam section than in the riverbed dam section, and the occurrence of vertical cracks are likely caused by slight variations in the water level. (C) 2014 Elsevier B.V. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available