4.6 Article

Use of HVDC links for power system restoration

Journal

ELECTRIC POWER SYSTEMS RESEARCH
Volume 79, Issue 6, Pages 973-983

Publisher

ELSEVIER SCIENCE SA
DOI: 10.1016/j.epsr.2008.12.013

Keywords

HVDC transmission; Power system restoration; Frequency control; Synchronous compensator

Ask authors/readers for more resources

Power system restoration plans worldwide have often been based on black start units capable of supplying cranking power to bulk generation plants. The increase in the number and size of CCGT plants and other forms of generation with low regulating capacity and requiring a restless growing power for the cranking phase needs that new strategies and tools be developed for facing the unlucky event of a black-out. The study presents the possibility of using HVDC links with a synchronous compensator at the receiving end. Such systems have high regulating capacity and reliability which are precious characteristics during the critical phases of the restoration. A detailed stability analysis is developed for checking the correct size of the compensator. Electromagnetic simulations prove the validity of the solution. (C) 2008 Elsevier B.V. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available