4.3 Article

Balancing and scheduling of flexible mixed model assembly lines

Journal

CONSTRAINTS
Volume 18, Issue 3, Pages 434-469

Publisher

SPRINGER
DOI: 10.1007/s10601-013-9142-6

Keywords

Mixed model assembly lines; Balancing; Sequencing; Scheduling; Mixed integer programming; Constraint programming; Decomposition

Ask authors/readers for more resources

Mixed model assembly line literature involves two problems: balancing and model sequencing. The general tendency in current studies is to deal with these problems in different time frames. However, in today's competitive market, the mixed model assembly line balancing problem has been turned into an operational problem. In this paper, we propose mixed integer programming (MIP) and constraint programming (CP) models which consider both balancing and model sequencing within the same formulation along with the optimal schedule of tasks at a station. Furthermore, we also compare the proposed exact models with decomposition schemes developed for solving different instances of varying sizes. This is the first paper in the literature which takes into account the network type precedence diagrams and limited buffer capacities between stations. Besides, it is the first study that CP method is applied to balancing and scheduling of mixed model assembly lines. Our empirical study shows that the CP approach outperforms the MIP approach as well as the decomposition schemes.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.3
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available