4.7 Article

Optimal production run length in deteriorating production processes with fuzzy elapsed time

Journal

COMPUTERS & INDUSTRIAL ENGINEERING
Volume 56, Issue 4, Pages 1627-1632

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cie.2008.10.012

Keywords

Production run length; Deteriorating; Fuzzy variable

Ask authors/readers for more resources

This paper investigates the optimal production run length in deteriorating production processes, where the elapsed time until the production process shifts is characterized as a fuzzy variable, also the setup cost and the holding cost are characterized as fuzzy variables, respectively. A mathematical formula representing the expected average cost per unit time is derived, and some properties are obtained to establish an efficient solution procedure. Since there is no closed-form expression for the optimal production run length, an approximate solving approach is presented. Finally, two numerical examples are given to illustrate the procedure of searching the optimal solutions. (C) 2008 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available