Industrial test and techno-economic analysis of CO2 capture in Huaneng Beijing coal-fired power station

Title
Industrial test and techno-economic analysis of CO2 capture in Huaneng Beijing coal-fired power station
Authors
Keywords
-
Journal
APPLIED ENERGY
Volume 87, Issue 11, Pages 3347-3354
Publisher
Elsevier BV
Online
2010-07-08
DOI
10.1016/j.apenergy.2010.03.007