4.8 Article

Optimum sizing of wind-battery systems incorporating resource uncertainty

Journal

APPLIED ENERGY
Volume 87, Issue 8, Pages 2712-2727

Publisher

ELSEVIER SCI LTD
DOI: 10.1016/j.apenergy.2010.03.027

Keywords

Wind-battery system; Chance constrained programming; Sizing curve; Design space; Wind resource uncertainty

Ask authors/readers for more resources

The inherent uncertainty of the wind is a major impediment for successful implementation of wind based power generation technology A methodology has been proposed in this paper to incorporate wind speed uncertainty in sizing wind-battery system for isolated applications. The uncertainty associated with the wind speed is incorporated using chance constraint programming approach. For a pre-specified reliability requirement, a deterministic equivalent energy balance equation may be derived from the chance constraint that allows time series simulation of the entire system. This results in a generation of the entire set of feasible design options, satisfying different system level constraints, on a battery capacity vs. generator rating diagram, also known as the design space The proposed methodology highlights the tradeoffs between the wind turbine rating, rotor diameter and the battery size for a given reliability of power supply The optimum configuration is chosen on the basis of the minimum cost of energy (US$/kWh) It is shown with the help of illustrative examples that the proposed methodology is generic and flexible to incorporate alternate sub-component models (C) 2010 Elsevier Ltd All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.8
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available