Installation of Integral Prefabricated Bridge Abutment and Pier with Flexible Water Stop Curtain

Title
Installation of Integral Prefabricated Bridge Abutment and Pier with Flexible Water Stop Curtain
Authors
Keywords
-
Journal
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
Volume 144, Issue 9, Pages 04018087
Publisher
American Society of Civil Engineers (ASCE)
Online
2018-07-04
DOI
10.1061/(asce)co.1943-7862.0001544

Ask authors/readers for more resources

Discover Peeref hubs

Discuss science. Find collaborators. Network.

Join a conversation

Create your own webinar

Interested in hosting your own webinar? Check the schedule and propose your idea to the Peeref Content Team.

Create Now