A biased random-key genetic algorithm for the project scheduling problem with flexible resources
Published 2018 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
A biased random-key genetic algorithm for the project scheduling problem with flexible resources
Authors
Keywords
Resource-constrained project scheduling, Flexible resources, Biased random-key genetic algorithm, 90B35 (Scheduling theory, deterministic), 90C59 (Approximation methods and heuristics)
Journal
Top
Volume 26, Issue 2, Pages 283-308
Publisher
Springer Nature
Online
2018-04-16
DOI
10.1007/s11750-018-0472-9
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- Minimizing average project team size given multi-skilled workers with heterogeneous skill levels
- (2016) Matthias Walter et al. COMPUTERS & OPERATIONS RESEARCH
- Priority-based heuristics for the multi-skill resource constrained project scheduling problem
- (2016) Bernardo F. Almeida et al. EXPERT SYSTEMS WITH APPLICATIONS
- A biased random-key genetic algorithm for the capacitated minimum spanning tree problem
- (2015) Efrain Ruiz et al. COMPUTERS & OPERATIONS RESEARCH
- A biased random-key genetic algorithm for the unequal area facility layout problem
- (2015) José Fernando Gonçalves et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- The impact of fixed and variable costs in a multi-skill project scheduling problem: An empirical study
- (2014) Isabel Correia et al. COMPUTERS & INDUSTRIAL ENGINEERING
- A biased random key genetic algorithm for 2D and 3D bin packing problems
- (2013) José Fernando Gonçalves et al. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
- Project scheduling with finite or infinite number of activity processing modes – A survey
- (2010) Jan Węglarz et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- A biased random-key genetic algorithm with forward-backward improvement for the resource constrained project scheduling problem
- (2010) José Fernando Gonçalves et al. JOURNAL OF HEURISTICS
- Biased random-key genetic algorithms for combinatorial optimization
- (2010) José Fernando Gonçalves et al. JOURNAL OF HEURISTICS
- Project scheduling with flexible resources: formulation and inequalities
- (2010) Isabel Correia et al. OR SPECTRUM
- A survey of variants and extensions of the resource-constrained project scheduling problem
- (2009) Sönke Hartmann et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Scheduling and staffing multiple projects with a multi-skilled workforce
- (2009) Christian Heimerl et al. OR SPECTRUM
- Competence-driven project portfolio selection, scheduling and staff assignment
- (2008) Walter J. Gutjahr et al. Central European Journal of Operations Research
- Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm
- (2008) Haitao Li et al. JOURNAL OF SCHEDULING
- A random key based genetic algorithm for the resource constrained project scheduling problem
- (2007) J.J.M. Mendes et al. COMPUTERS & OPERATIONS RESEARCH
- A genetic algorithm for the resource constrained multi-project scheduling problem
- (2007) J.F. Gonçalves et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
Discover Peeref hubs
Discuss science. Find collaborators. Network.
Join a conversationCreate your own webinar
Interested in hosting your own webinar? Check the schedule and propose your idea to the Peeref Content Team.
Create Now