Journal
IEEE TRANSACTIONS ON POWER SYSTEMS
Volume 33, Issue 2, Pages 1173-1183Publisher
IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRS.2017.2734654
Keywords
Automatic generation control; control performance standard; multiple linear regression; regulation reserve requirement
Categories
Ask authors/readers for more resources
This paper proposes a method to estimate the real-time regulation reserve requirement based on the NERC Control Performance Standard (CPS). This method is constructed via three steps: first, a Multiple Linear Regression (MLR) model is applied to abstract the relationship between CPS and regulation reserve and other system conditions using training observations generated from a load frequency control model; second, a stepwise method with cross validation is used to select the most relevant features of MLR; and third, the regulation reserve requirement is computed by the MLR model as a function of the predicted system conditions and target CPS score. The recursive least square (RLS) method is used to update the model parameters in an online environment. Testing on a single area automatic generation control model with load and wind data from CAISO 33% Renewable Portfolio Standard scenario indicates the method outperforms methods used in the industry today.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available