Efficient 3-D reliability analysis of the 530m high abutment slope at Jinping I Hydropower Station during construction

Title
Efficient 3-D reliability analysis of the 530m high abutment slope at Jinping I Hydropower Station during construction
Authors
Keywords
Jinping I Hydropower Station, Rock slope, Reliability analysis, Slope stabilization, Shear strength reduction, Response surface
Journal
ENGINEERING GEOLOGY
Volume 195, Issue -, Pages 269-281
Publisher
Elsevier BV
Online
2015-06-17
DOI
10.1016/j.enggeo.2015.06.007

Ask authors/readers for more resources

Reprint

Contact the author

Create your own webinar

Interested in hosting your own webinar? Check the schedule and propose your idea to the Peeref Content Team.

Create Now

Become a Peeref-certified reviewer

The Peeref Institute provides free reviewer training that teaches the core competencies of the academic peer review process.

Get Started