A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times

Journal

COMPUTERS & OPERATIONS RESEARCH
Volume 63, Issue -, Pages 72-82

Publisher

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cor.2015.04.010

Keywords

Capacitated lot-sizing and scheduling; Sequence-dependent setup; Unrelated parallel machines; Lagrangian relaxation; Simulated annealing

Funding

  1. Intel Higher Education Programme
  2. National Natural Science Foundation of China [71102011, 71472108]

Ask authors/readers for more resources

This paper examines the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times, time windows, machine eligibility and preference constraints. Such problems are quite common in the semiconductor manufacturing industry. In particular, this paper pays special attention to the chipset production in the semiconductor Assembly and Test Manufacturing (ATM) factory and constructs a Mixed Integer Programming (MIP) model for the problem. The primal problem is decomposed into a lot-sizing subproblem and a set of single-machine scheduling subproblems by Lagrangian decomposition. A Lagrangian-based heuristic algorithm, which incorporates the simulated annealing algorithm aimed at searching for a better solution during the feasibility construction stage, is proposed. Computational experiments show that the proposed hybrid algorithm outperforms other heuristic algorithms and meets the practical requirement for the tested ATM factory. (C) 2015 Elsevier Ltd. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available