Robust Parallel Machine Scheduling Problem with Uncertainties and Sequence-Dependent Setup Time
Published 2016 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
Robust Parallel Machine Scheduling Problem with Uncertainties and Sequence-Dependent Setup Time
Authors
Keywords
-
Journal
Scientific Programming
Volume 2016, Issue -, Pages 1-13
Publisher
Hindawi Limited
Online
2016-11-23
DOI
10.1155/2016/5127253
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- Stochastic resource allocation for containerized cargo transportation networks when capacities are uncertain
- (2016) Xinchang Wang TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW
- Multi-factory parallel machine problems: Improved mathematical models and artificial bee colony algorithm
- (2015) M. Yazdani et al. COMPUTERS & INDUSTRIAL ENGINEERING
- Multi-objective optimization of parallel machine scheduling integrated with multi-resources preventive maintenance planning
- (2015) Shijin Wang et al. JOURNAL OF MANUFACTURING SYSTEMS
- A Robust Optimization Model for Managing Elective Admission in a Public Hospital
- (2015) Fanwen Meng et al. OPERATIONS RESEARCH
- A hybrid tabu search for batching and sequencing decisions in a single machine environment
- (2014) Yasothei Suppiah et al. COMPUTERS & INDUSTRIAL ENGINEERING
- An artificial bee colony algorithm approach for unrelated parallel machine scheduling with processing set restrictions, job sequence-dependent setup times, and due date
- (2014) Erdal Caniyilmaz et al. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
- Hedge against total flow time uncertainty of the uniform parallel machine scheduling problem with interval data
- (2014) Xiaoqing Xu et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Bi-objective optimisation for integrated scheduling of single machine with setup times and preventive maintenance planning
- (2013) Shijin Wang INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Robust makespan minimisation in identical parallel machine scheduling problem with interval data
- (2013) Xiaoqing Xu et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Bus dwell time estimation at bus bays: A probabilistic approach
- (2013) Qiang Meng et al. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES
- Robust optimization model of schedule design for a fixed bus route
- (2012) Yadan Yan et al. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES
- Robust schedule design for liner shipping services
- (2012) Shuaian Wang et al. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW
- Robust scheduling on a single machine to minimize total flow time
- (2011) Chung-Cheng Lu et al. COMPUTERS & OPERATIONS RESEARCH
- Scheduling of a hub reentrant job shop to minimize makespan
- (2011) Xie Xie et al. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
- Proportional lot-sizing and scheduling problem with identical parallel machines
- (2011) Waldemar Kaczmarczyk INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times
- (2010) Rene Driessel et al. COMPUTERS & INDUSTRIAL ENGINEERING
- A hybrid metaheuristic for the prize-collecting single machine scheduling problem with sequence-dependent setup times
- (2010) Xianpeng Wang et al. COMPUTERS & OPERATIONS RESEARCH
- Two-machine flowshop scheduling with intermediate transportation under job physical space consideration
- (2010) Hua Gong et al. COMPUTERS & OPERATIONS RESEARCH
- Two-agent single-machine scheduling with position-dependent processing times
- (2009) Peng Liu et al. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
- Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times
- (2009) Ali Allahverdi et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Min–max and min–max regret versions of combinatorial optimization problems: A survey
- (2008) Hassene Aissi et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- A 2-approximation algorithm for interval data minmax regret sequencing problems with the total flow time criterion
- (2007) Adam Kasperski et al. OPERATIONS RESEARCH LETTERS
Discover Peeref hubs
Discuss science. Find collaborators. Network.
Join a conversationAdd your recorded webinar
Do you already have a recorded webinar? Grow your audience and get more views by easily listing your recording on Peeref.
Upload Now