Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model
Published 2023 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model
Authors
Keywords
-
Journal
International Transactions in Operational Research
Volume -, Issue -, Pages -
Publisher
Wiley
Online
2023-05-26
DOI
10.1111/itor.13325
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- Distributionally robust scheduling algorithms for total flow time minimization on parallel machines using norm regularizations
- (2022) Antonin Novak et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Berth allocation and quay crane assignment/scheduling problem under uncertainty: A survey
- (2022) Filipe Rodrigues et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Data-driven Wasserstein distributionally robust mitigation and recovery against random supply chain disruption
- (2022) Yunzhi Cao et al. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW
- Robust and Distributionally Robust Optimization Models for Linear Support Vector Machine
- (2022) Daniel Faccini et al. COMPUTERS & OPERATIONS RESEARCH
- Data-driven distributionally robust surgery planning in flexible operating rooms over a Wasserstein ambiguity
- (2022) Karmel S. Shehadeh COMPUTERS & OPERATIONS RESEARCH
- Distributionally robust optimization for the berth allocation problem under uncertainty
- (2022) Agostinho Agra et al. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL
- A Novel Proactive–Reactive Scheduling Approach for the Quay Crane Scheduling Problem: A VUCA Perspective
- (2022) Kaoutar Chargui et al. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT
- A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals
- (2021) Abtin Nourmohammadzadeh et al. ANNALS OF MATHEMATICS AND ARTIFICIAL INTELLIGENCE
- An exact robust approach for the integrated berth allocation and quay crane scheduling problem under uncertain arrival times
- (2021) Filipe Rodrigues et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Two-stage distributionally robust programming based on worst-case mean-CVaR criterion and application to disaster relief management
- (2021) Weiqiao Wang et al. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW
- Berth allocation problem with uncertain vessel handling times considering weather conditions
- (2021) Liming Guo et al. COMPUTERS & INDUSTRIAL ENGINEERING
- A comprehensive review of quay crane scheduling, yard operations and integrations thereof in container terminals
- (2020) Damla Kizilay et al. Flexible Services and Manufacturing Journal
- Stochastic programming approach for unidirectional quay crane scheduling problem with uncertainty
- (2020) Shoufeng Ma et al. JOURNAL OF SCHEDULING
- A Distributionally Robust Optimization Approach for Multi-Product Inventory Decisions with Budget Constraint and Demand and Yield Uncertainties
- (2020) Ruozhen Qiu et al. COMPUTERS & OPERATIONS RESEARCH
- An exact algorithm for the unidirectional quay crane scheduling problem with vessel stability
- (2020) Defeng Sun et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Simulated annealing based simulation optimization method for solving integrated berth allocation and quay crane scheduling problems
- (2019) Gokcecicek Tasoglu et al. SIMULATION MODELLING PRACTICE AND THEORY
- Distributionally robust scheduling on parallel machines under moment uncertainty
- (2018) Zhiqi Chang et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- The Quay Crane Scheduling Problem With Stability Constraints
- (2018) Zizhen Zhang et al. IEEE Transactions on Automation Science and Engineering
- Decomposition Algorithms for Two-Stage Distributionally Robust Mixed Binary Programs
- (2018) Manish Bansal et al. SIAM JOURNAL ON OPTIMIZATION
- The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion
- (2017) Jiang Hang Chen et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Data-driven distributionally robust optimization using the Wasserstein metric: performance guarantees and tractable reformulations
- (2017) Peyman Mohajerin Esfahani et al. MATHEMATICAL PROGRAMMING
- Behavior perception-based disruption models for berth allocation and quay crane assignment problems
- (2016) Changchun Liu et al. COMPUTERS & INDUSTRIAL ENGINEERING
- A simulation-based Genetic Algorithm approach for the quay crane scheduling under uncertainty
- (2016) Noura Al-Dhaheri et al. SIMULATION MODELLING PRACTICE AND THEORY
- A robust optimization approach to the integrated berth allocation and quay crane assignment problem
- (2016) Xiao Ting Shang et al. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
- (2015) Christian Bierwirth et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Optimal Algorithm for the General Quay Crane Double-Cycling Problem
- (2015) Chung-Yee Lee et al. TRANSPORTATION SCIENCE
- A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules
- (2013) Pasquale Legato et al. 4OR-A Quarterly Journal of Operations Research
- An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem
- (2013) Jiang Hang Chen et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Modeling and solving rich quay crane scheduling problems
- (2011) Pasquale Legato et al. COMPUTERS & OPERATIONS RESEARCH
- A unified approach for the evaluation of quay crane scheduling models and algorithms
- (2010) Frank Meisel et al. COMPUTERS & OPERATIONS RESEARCH
- A survey of berth allocation and quay crane scheduling problems in container terminals
- (2009) Christian Bierwirth et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Multiship Crane Sequencing with Yard Congestion Constraints
- (2009) Shawn Choo et al. TRANSPORTATION SCIENCE
- Quay crane scheduling with non-interference constraints in port container terminals
- (2006) Der-Horng Lee et al. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW
Find Funding. Review Successful Grants.
Explore over 25,000 new funding opportunities and over 6,000,000 successful grants.
ExploreAsk a Question. Answer a Question.
Quickly pose questions to the entire community. Debate answers and get clarity on the most important issues facing researchers.
Get Started