4.6 Article

Novel Quality-Embedded Earned Value Performance Analysis Tool for Sustainable Project Portfolio Production

Journal

SUSTAINABILITY
Volume 14, Issue 13, Pages -

Publisher

MDPI
DOI: 10.3390/su14138174

Keywords

earned value; TQM; triple constraints control; project portfolio; quality quantification

Funding

  1. Fujian Province Science and Technology Department of China [2021I0014]
  2. Quanzhou Tongjiang Scholar Special Fund [600005-Z17X0234]
  3. Huaqiao University [17BS201]
  4. Universiti Teknologi Malaysia (UTM) [05E79]

Ask authors/readers for more resources

This study aims to develop a tool that can evaluate and manage project quality, cost, and schedule simultaneously, incorporating quality management and portfolio management functions into project planning, organizing, monitoring, managing, and reporting for project portfolio stakeholders.
Although many project portfolio management tools have been developed, little has been found capable of evaluating and managing project quality, cost, and schedule simultaneously. Limited cross-project references also limit lessons learned in the context of triple constraints. This study aims to embed quality check into the earned value management (EVM) method and develop an extended tool for triple constraint management based on EVM. The purpose is to evaluate and manage the triple constraints of a project in one go, incorporating quality management and portfolio management functions into costing and scheduling. The newly developed tools are tested and validated in real-world case studies. It was proven to assist project portfolio stakeholders in triple constraints planning, organizing, monitoring, managing, and reporting using a single reporting format.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.6
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available