Research on intelligent workshop resource scheduling method based on improved NSGA-II algorithm
Published 2021 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
Research on intelligent workshop resource scheduling method based on improved NSGA-II algorithm
Authors
Keywords
Intelligent manufacturing, Workshop resource scheduling, Improved NSGA-II algorithm, Variable proportion
Journal
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING
Volume 71, Issue -, Pages 102141
Publisher
Elsevier BV
Online
2021-03-03
DOI
10.1016/j.rcim.2021.102141
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- An integrated processing energy modeling and optimization of automated robotic polishing system
- (2020) Huajun Cao et al. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING
- Optimizing the Low-Carbon Flexible Job Shop Scheduling Problem with Discrete Whale Optimization Algorithm
- (2019) Fei Luan et al. Mathematics
- A hybrid artificial bee colony algorithm for flexible job shop scheduling with worker flexibility
- (2019) Guiliang Gong et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Multi-objective optimization for energy-efficient flexible job shop scheduling problem with transportation constraints
- (2019) Min Dai et al. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING
- Service composition model and method in cloud manufacturing
- (2019) Minghai Yuan et al. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING
- Optimizing the Low-Carbon Flexible Job Shop Scheduling Problem Considering Energy Consumption
- (2018) Tianhua Jiang et al. IEEE Access
- Two-level multi-task scheduling in a cloud manufacturing environment
- (2018) Feng Li et al. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING
- Open shop scheduling problem to minimize total weighted completion time
- (2016) Danyu Bai et al. ENGINEERING OPTIMIZATION
- Flexible job shop scheduling based on improved hybrid immune algorithm
- (2016) Xu Liang et al. Journal of Ambient Intelligence and Humanized Computing
- A hybrid discrete particle swarm optimization for dual-resource constrained job shop scheduling with resource flexibility
- (2015) Jing Zhang et al. JOURNAL OF INTELLIGENT MANUFACTURING
- Time scheduling and optimization of industrial robotized tasks based on genetic algorithms
- (2015) Khelifa Baizid et al. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING
- Towards a wisdom manufacturing vision
- (2014) Xifan Yao et al. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING
- A branch-and-bound algorithm for two-stage no-wait hybrid flow-shop scheduling
- (2014) Shijin Wang et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Mathematical modelling and a meta-heuristic for flexible job shop scheduling
- (2013) V. Roshanaei et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm
- (2013) Min Dai et al. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING
- Sensor deployment based on fuzzy graph considering heterogeneity and multiple-objectives to diagnose manufacturing system
- (2012) Zhenhua Wu et al. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING
Find Funding. Review Successful Grants.
Explore over 25,000 new funding opportunities and over 6,000,000 successful grants.
ExplorePublish scientific posters with Peeref
Peeref publishes scientific posters from all research disciplines. Our Diamond Open Access policy means free access to content and no publication fees for authors.
Learn More