Journal
IET GENERATION TRANSMISSION & DISTRIBUTION
Volume 10, Issue 4, Pages 841-848Publisher
INST ENGINEERING TECHNOLOGY-IET
DOI: 10.1049/iet-gtd.2015.0791
Keywords
-
Categories
Funding
- European Union [608540]
Ask authors/readers for more resources
In the planning and operation of power systems, actions are taken in different processes and time-horizons. The purpose of these actions is to secure a high reliability level. Although the three main processes (grid development, asset management, and system operation) are described in literature, there has been no explicit study on the time-horizons (long-term, mid-term, and short-term) and actual time-scale (decades, years, months, etc.) that these processes focus on. This study aims at making a review of the various activities performed by transmission system operators while reviewing the concept of each time-horizon and methodologies developed in literature. As decisions taken in different time-horizons can influence each other, the interactions and overlapping are discussed.
Authors
I am an author on this paper
Click your name to claim this paper and add it to your profile.
Reviews
Recommended
No Data Available