Evaluation of TBM Cutter Wear in Naghadeh Water Conveyance Tunnel and Developing a New Prediction Model
Published 2021 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
Evaluation of TBM Cutter Wear in Naghadeh Water Conveyance Tunnel and Developing a New Prediction Model
Authors
Keywords
-
Journal
ROCK MECHANICS AND ROCK ENGINEERING
Volume -, Issue -, Pages -
Publisher
Springer Science and Business Media LLC
Online
2021-09-15
DOI
10.1007/s00603-021-02640-7
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- Tracking of disc cutter wear in TBM tunneling: a case study of Kerman water conveyance tunnel
- (2020) Morteza Karami et al. Bulletin of Engineering Geology and the Environment
- Development of an empirical model to estimate disc cutter wear for sedimentary and low to medium grade metamorphic rocks
- (2018) Jafar Hassanpour TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY
- Decision Plots for preliminary design of single-shield TBMs
- (2017) L. Repetto et al. ENGINEERING GEOLOGY
- A Wear Rule and Cutter Life Prediction Model of a 20-in. TBM Cutter for Granite: A Case Study of a Water Conveyance Tunnel in China
- (2017) Quansheng Liu et al. ROCK MECHANICS AND ROCK ENGINEERING
- Experimental study of specific matching characteristics of tunnel boring machine cutter ring properties and rock
- (2017) Laikuang Lin et al. WEAR
- Experimental study on wear behaviors of TBM disc cutter ring under drying, water and seawater conditions
- (2017) Xuhui Zhang et al. WEAR
- Tunnel boring machine collision with an ancient boulder beach during the excavation of the Barcelona city subway L10 line: A case of adverse geology and resulting engineering solutions
- (2016) Marta Filbà et al. ENGINEERING GEOLOGY
- Effect of geomechanical properties on Cerchar Abrasivity Index (CAI) and its application to TBM tunnelling
- (2016) Tae Young Ko et al. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY
- Parametric study of soil abrasivity for predicting wear issue in TBM tunneling projects
- (2015) Ghodrat Barzegari et al. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY
- Disc cutter wear prediction for a hard rock TBM cutterhead based on energy analysis
- (2015) Lihui Wang et al. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY
- EPB tunneling challenges in bouldery ground: a new experience on the Tabriz metro line 1, Iran
- (2014) Ghodrat Barzegari et al. Bulletin of Engineering Geology and the Environment
- Introduction of an empirical TBM cutter wear prediction model for pyroclastic and mafic igneous rocks; a case history of Karaj water conveyance tunnel, Iran
- (2014) J. Hassanpour et al. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY
- An application of rock engineering systems for estimating TBM downtimes
- (2013) Omid Frough et al. ENGINEERING GEOLOGY
- A newly developed soil abrasion testing method for tunnelling using shield machines
- (2013) Ghodrat Barzegari et al. QUARTERLY JOURNAL OF ENGINEERING GEOLOGY AND HYDROGEOLOGY
- Challenges of methods and approaches for estimating soil abrasivity in soft ground TBM tunnelling
- (2013) P.D. Jakobsen et al. WEAR
- The energy method to predict disc cutter wear extent for hard rock TBMs
- (2011) Lihui Wang et al. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY
Find Funding. Review Successful Grants.
Explore over 25,000 new funding opportunities and over 6,000,000 successful grants.
ExploreDiscover Peeref hubs
Discuss science. Find collaborators. Network.
Join a conversation