4.7 Article

Reliability-driven scheduling of time/cost-constrained grid workflows

Publisher

ELSEVIER
DOI: 10.1016/j.future.2015.07.014

Keywords

Workflow scheduling; Reliability; Real-time systems; Grid computing; Constrained optimization; Ant colony optimization

Funding

  1. Iran Telecommunication Research Center (ITRC), Tehran, Iran [12200/500]

Ask authors/readers for more resources

Workflow scheduling in Grids and Clouds is a NP-Hard problem. Constrained workflow scheduling, arisen in recent years, provides the description of the user requirements through defining constraints on factors like makespan and cost. This paper proposes a scheduling algorithm to maximize the workflow execution reliability while respecting the user-defined deadline and budget. We have used ant colony system to minimize an aggregation of reliability and constraints violation. Three novel heuristics have been proposed which are adaptively selected by ants. Two of them are employed to find feasible schedules and the other is used to enhance the reliability. Two methods have been investigated for time and cost considerations in the resource selection. One of them assigns equal importance to the time and cost factors, and the other weighs them according to the tightness of satisfaction of the corresponding constraints. Simulation results demonstrate the effectiveness of the proposed algorithm in finding feasible schedules with high reliability. As it is shown, as an additional achievement, the Grid profit loss has been decreased. (C) 2015 Elsevier B.V. All rights reserved.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available