Strength–redundancy allocation problem using artificial bee colony algorithm for multi-state systems
Published 2021 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
Strength–redundancy allocation problem using artificial bee colony algorithm for multi-state systems
Authors
Keywords
Strength–redundancy allocation problem, Reliability optimization design, Multi-state systems, Load–strength interference model, Artificial bee colony algorithm
Journal
RELIABILITY ENGINEERING & SYSTEM SAFETY
Volume 209, Issue -, Pages 107494
Publisher
Elsevier BV
Online
2021-01-23
DOI
10.1016/j.ress.2021.107494
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- Predicting adhesive sealing life of Li-ion pouch cell using a fusion method considering time-varying dependence
- (2019) Kunsong Lin et al. JOURNAL OF ADHESION
- Inference for the generalized exponential stress-strength model
- (2018) Bing Xing Wang et al. APPLIED MATHEMATICAL MODELLING
- An improved artificial bee colony algorithm and its application to reliability optimization problems
- (2018) Soheila Ghambari et al. APPLIED SOFT COMPUTING
- An improved particle swarm optimization algorithm for reliability-redundancy allocation problem with mixed redundancy strategy and heterogeneous components
- (2018) Zhiyuan Ouyang et al. RELIABILITY ENGINEERING & SYSTEM SAFETY
- A Stress-Strength Time-Varying Correlation Interference Model for Structural Reliability Analysis Using Copulas
- (2017) Jianchun Zhang et al. IEEE TRANSACTIONS ON RELIABILITY
- Reliability–redundancy allocation problem considering optimal redundancy strategy using parallel genetic algorithm
- (2017) Heungseob Kim et al. RELIABILITY ENGINEERING & SYSTEM SAFETY
- Optimal reliability design of a system with k -out-of- n subsystems considering redundancy strategies
- (2017) Heungseob Kim RELIABILITY ENGINEERING & SYSTEM SAFETY
- Response surface methods for slope reliability analysis: Review and comparison
- (2016) Dian-Qing Li et al. ENGINEERING GEOLOGY
- A penalty guided stochastic fractal search approach for system reliability optimization
- (2016) Mohamed Arezki Mellal et al. RELIABILITY ENGINEERING & SYSTEM SAFETY
- Classical and Bayesian estimation of reliability in a multicomponent stress–strength model based on a general class of inverse exponentiated distributions
- (2016) Fatih Kızılaslan STATISTICAL PAPERS
- Reliability analysis of structures using stochastic response surface method and saddlepoint approximation
- (2016) Xianzhen Huang et al. STRUCTURAL AND MULTIDISCIPLINARY OPTIMIZATION
- A novel artificial fish swarm algorithm for solving large-scale reliability–redundancy application problem
- (2015) Qiang He et al. ISA TRANSACTIONS
- A particle-based simplified swarm optimization algorithm for reliability redundancy allocation problems
- (2015) Chia-Ling Huang RELIABILITY ENGINEERING & SYSTEM SAFETY
- Time-dependent reliability of aging structures in the presence of non-stationary loads and degradation
- (2015) Quanwang Li et al. STRUCTURAL SAFETY
- An efficient two phase approach for solving reliability–redundancy allocation problem using artificial bee colony technique
- (2013) Harish Garg et al. COMPUTERS & OPERATIONS RESEARCH
- Multi-objective reliability-redundancy allocation problem using particle swarm optimization
- (2012) Harish Garg et al. COMPUTERS & INDUSTRIAL ENGINEERING
- Evaluation of the reliability of high concentrator GaAs solar cells by means of temperature accelerated aging tests
- (2012) N. Núñez et al. PROGRESS IN PHOTOVOLTAICS
- A coevolutionary differential evolution with harmony search for reliability–redundancy optimization
- (2011) Ling Wang et al. EXPERT SYSTEMS WITH APPLICATIONS
- Solving reliability redundancy allocation problems using an artificial bee colony algorithm
- (2010) Wei-Chang Yeh et al. COMPUTERS & OPERATIONS RESEARCH
- An effective global harmony search algorithm for reliability problems
- (2010) Dexuan Zou et al. EXPERT SYSTEMS WITH APPLICATIONS
- An improved particle swarm optimization algorithm for reliability problems
- (2010) Peifeng Wu et al. ISA TRANSACTIONS
- Photovoltaic module reliability model based on field degradation studies
- (2008) Manuel Vázquez et al. PROGRESS IN PHOTOVOLTAICS
Discover Peeref hubs
Discuss science. Find collaborators. Network.
Join a conversationCreate your own webinar
Interested in hosting your own webinar? Check the schedule and propose your idea to the Peeref Content Team.
Create Now