Integrated optimization of bus bridging routes and timetables for rail disruptions
Published 2021 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
Integrated optimization of bus bridging routes and timetables for rail disruptions
Authors
Keywords
Bus bridging, Rail disruption, Route design, Timetable, Tabu search
Journal
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
Volume -, Issue -, Pages -
Publisher
Elsevier BV
Online
2021-03-18
DOI
10.1016/j.ejor.2021.03.014
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- Battery electric bus infrastructure planning under demand uncertainty
- (2020) Kun An TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES
- Railway timetable rescheduling with flexible stopping and flexible short-turning during disruptions
- (2019) Yongqiu Zhu et al. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL
- Autonomous shuttle bus service timetabling and vehicle scheduling using skip-stop tactic
- (2019) Zhichao Cao et al. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES
- Optimization of Bus Bridging Service under Unexpected Metro Disruptions with Dynamic Passenger Flows
- (2019) Jiadong Wang et al. JOURNAL OF ADVANCED TRANSPORTATION
- Parallel shuttle bus service design for planned mass rapid transit shutdown: The Singapore experience
- (2019) Xueping Dou et al. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES
- Metro disruption management: Contracting substitute bus service under uncertain system recovery time
- (2019) Shuyang Zhang et al. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES
- Robust bus bridging service design under rail transit system disruptions
- (2019) Jinpeng Liang et al. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW
- Optimal Bus-Bridging Service under a Metro Station Disruption
- (2018) Haodong Yin et al. JOURNAL OF ADVANCED TRANSPORTATION
- The impact of planned disruptions on rail passenger demand
- (2018) Jeremy D. Shires et al. TRANSPORTATION
- Service-oriented train timetabling with collaborative passenger flow control on an oversaturated metro line: An integer linear optimization approach
- (2018) Jungang Shi et al. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL
- Plan-based flexible bus bridging operation strategy
- (2018) Wei Gu et al. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES
- Metro disruption management: Optimal initiation time of substitute bus services under uncertain system recovery time
- (2018) Shuyang Zhang et al. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES
- Passenger Advice and Rolling Stock Rescheduling Under Uncertainty for Disruption Management
- (2018) Evelien van der Hurk et al. TRANSPORTATION SCIENCE
- An eigenmodel for iterative line planning, timetabling and vehicle scheduling in public transportation
- (2017) Anita Schöbel TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES
- Customized bus service design for jointly optimizing passenger-to-vehicle assignment and vehicle routing
- (2017) Lu (Carol) Tong et al. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES
- Planning Bus Bridging Evacuation during Rail Transit Operation Disruption
- (2016) Hua Hu et al. JOURNAL OF URBAN PLANNING AND DEVELOPMENT
- Rescheduling a metro line in an over-crowded situation after disruptions
- (2016) Yuan Gao et al. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL
- Two-phase stochastic program for transit network design under demand uncertainty
- (2016) Kun An et al. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL
- Shuttle Planning for Link Closures in Urban Public Transport Networks
- (2016) Evelien van der Hurk et al. TRANSPORTATION SCIENCE
- Optimizing Bus Bridging Services in Response to Disruptions of Urban Transit Rail Networks
- (2016) Jian Gang Jin et al. TRANSPORTATION SCIENCE
- Planning Bus Bridging Evacuation during Rail Transit Operation Disruption
- (2016) Hua Hu et al. JOURNAL OF URBAN PLANNING AND DEVELOPMENT
- A Feeder-Bus Dispatch Planning Model for Emergency Evacuation in Urban Rail Transit Corridors
- (2016) Yun Wang et al. PLoS One
- Modeling and Simulating Passenger Behavior for a Station Closure in a Rail Transit Network
- (2016) Haodong Yin et al. PLoS One
- Robust transit network design with stochastic demand considering development density
- (2015) Kun An et al. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL
- Train scheduling for minimizing passenger waiting time with time-dependent demand and skip-stop patterns: Nonlinear integer programming models with linear constraints
- (2015) Huimin Niu et al. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL
- Service Reliability–Based Transit Network Design with Stochastic Demand
- (2015) Kun An et al. TRANSPORTATION RESEARCH RECORD
- Bus Bridging Disruption in Rail Services With Frustrated and Impatient Passengers
- (2014) Yibing Wang et al. IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS
- Demand-driven timetable design for metro services
- (2014) Lijun Sun et al. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES
- Enhancing metro network resilience via localized integration with bus services
- (2014) Jian Gang Jin et al. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW
- Optimizing urban rail timetable under time-dependent demand and oversaturated conditions
- (2013) Huimin Niu et al. TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES
- Recovery of disruptions in rapid transit networks
- (2013) Luis Cadarso et al. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW
- Disruption Recovery in Passenger Railways
- (2013) Brendan Pender et al. TRANSPORTATION RESEARCH RECORD
- Service-Oriented Line Planning and Timetabling for Passenger Trains
- (2012) Mor Kaspi et al. TRANSPORTATION SCIENCE
Create your own webinar
Interested in hosting your own webinar? Check the schedule and propose your idea to the Peeref Content Team.
Create NowAsk a Question. Answer a Question.
Quickly pose questions to the entire community. Debate answers and get clarity on the most important issues facing researchers.
Get Started