Just-in-time scheduling for a distributed concrete precast flow shop system
Published 2021 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
Just-in-time scheduling for a distributed concrete precast flow shop system
Authors
Keywords
Scheduling, Distributed concrete precast flow shop, Metaheuristics, Earliness, Tardiness
Journal
COMPUTERS & OPERATIONS RESEARCH
Volume 129, Issue -, Pages 105204
Publisher
Elsevier BV
Online
2021-01-08
DOI
10.1016/j.cor.2020.105204
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- Dynamic production scheduling model under due date uncertainty in precast concrete construction
- (2020) Taehoon Kim et al. JOURNAL OF CLEANER PRODUCTION
- An improved artificial bee colony algorithm for addressing distributed flow shop with distance coefficient in a prefabricated system
- (2019) Jun-qing Li et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
- (2019) Robert Pellerin et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Effective heuristics and metaheuristics to minimize total flowtime for the distributed permutation flowshop problem
- (2019) Quan-Ke Pan et al. EXPERT SYSTEMS WITH APPLICATIONS
- An improved particle swarm optimization algorithm to solve hybrid flowshop scheduling problems with the effect of human factors – A case study
- (2019) M.K. Marichelvam et al. COMPUTERS & OPERATIONS RESEARCH
- Hybrid Artificial Bee Colony Algorithm for a Parallel Batching Distributed Flow-Shop Problem With Deteriorating Jobs
- (2019) Jun-Qing Li et al. IEEE Transactions on Cybernetics
- Framework for modeling operational uncertainty to optimize offsite production scheduling of precast components
- (2018) Zhaojing Wang et al. AUTOMATION IN CONSTRUCTION
- The distributed permutation flow shop to minimise the total flowtime
- (2018) Victor Fernandez-Viagas et al. COMPUTERS & INDUSTRIAL ENGINEERING
- Iterated Greedy methods for the distributed permutation flowshop scheduling problem
- (2018) Rubén Ruiz et al. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
- An Iterated Greedy Heuristic for Mixed No-Wait Flowshop Problems
- (2018) Yamin Wang et al. IEEE Transactions on Cybernetics
- Time-Variant Graph Classification
- (2018) Haishuai Wang et al. IEEE Transactions on Systems Man Cybernetics-Systems
- Scheduling a non-professional indoor football league: a tabu search based approach
- (2018) David Van Bulck et al. ANNALS OF OPERATIONS RESEARCH
- Optimized rescheduling of multiple production lines for flowshop production of reinforced precast concrete components
- (2018) Zhiliang Ma et al. AUTOMATION IN CONSTRUCTION
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs
- (2018) Tom Servranckx et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Modeling Worker Competence to Advance Precast Production Scheduling Optimization
- (2018) Zhaojing Wang et al. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
- An iterated greedy algorithm for solving the total tardiness parallel blocking flow shop scheduling problem
- (2018) Imma Ribas et al. EXPERT SYSTEMS WITH APPLICATIONS
- Improved Precast Production–Scheduling Model Considering the Whole Supply Chain
- (2017) Zhaojing Wang et al. JOURNAL OF COMPUTING IN CIVIL ENGINEERING
- Multi-objective adaptive large neighborhood search for distributed reentrant permutation flow shop scheduling
- (2016) Achmad P. Rifai et al. APPLIED SOFT COMPUTING
- Optimized flowshop scheduling of multiple production lines for precast production
- (2016) Zhitian Yang et al. AUTOMATION IN CONSTRUCTION
- Minimizing makespan for solving the distributed no-wait flowshop scheduling problem
- (2016) Shih-Wei Lin et al. COMPUTERS & INDUSTRIAL ENGINEERING
- An effective hybrid biogeography-based optimization algorithm for the distributed assembly permutation flow-shop scheduling problem
- (2016) Jian Lin et al. COMPUTERS & INDUSTRIAL ENGINEERING
- Simultaneous scheduling of machines and transport robots in flexible job shop environment using hybrid metaheuristics based on clustered holonic multiagent model
- (2016) Houssem Eddine Nouri et al. COMPUTERS & INDUSTRIAL ENGINEERING
- Optimal restricted due date assignment in scheduling
- (2016) Dvir Shabtay EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- An improved iterated greedy algorithm with a Tabu-based reconstruction strategy for the no-wait flowshop scheduling problem
- (2015) Jian-Ya Ding et al. APPLIED SOFT COMPUTING
- NEH-based heuristics for the permutation flowshop scheduling problem to minimise total tardiness
- (2015) Victor Fernandez-Viagas et al. COMPUTERS & OPERATIONS RESEARCH
- A survey on scheduling problems with due windows
- (2015) Adam Janiak et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Minimizing the total completion time in a distributed two stage assembly system with setup times
- (2014) Fuli Xiong et al. COMPUTERS & OPERATIONS RESEARCH
- A scatter search algorithm for the distributed permutation flowshop scheduling problem
- (2014) Bahman Naderi et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- A bounded-search iterated greedy algorithm for the distributed permutation flowshop scheduling problem
- (2014) Victor Fernandez-Viagas et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- The Distributed Assembly Permutation Flowshop Scheduling Problem
- (2013) Sara Hatami et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- An effective iterated greedy algorithm for the mixed no-idle permutation flowshop scheduling problem
- (2013) Quan-Ke Pan et al. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
- Parallel machine scheduling and common due window assignment with job independent earliness and tardiness costs
- (2012) Adam Janiak et al. INFORMATION SCIENCES
- An efficient tabu search algorithm for the distributed permutation flowshop scheduling problem
- (2012) Jian Gao et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Precast production scheduling using multi-objective genetic algorithms
- (2011) Chien-Ho Ko et al. EXPERT SYSTEMS WITH APPLICATIONS
- GA-based decision support systems for precast production planning
- (2010) Chien-Ho Ko et al. AUTOMATION IN CONSTRUCTION
- A production modeling with genetic algorithms for a stationary pre-cast supply chain
- (2010) Sherman H.A. Li et al. EXPERT SYSTEMS WITH APPLICATIONS
- An iterated greedy algorithm for the flowshop scheduling problem with blocking
- (2010) Imma Ribas et al. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
- The distributed permutation flowshop scheduling problem
- (2009) B. Naderi et al. COMPUTERS & OPERATIONS RESEARCH
- Minimising total tardiness in the m-machine flowshop problem: A review and evaluation of heuristics and metaheuristics
- (2006) Eva Vallada et al. COMPUTERS & OPERATIONS RESEARCH
- An Iterated Greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives
- (2006) Rubén Ruiz et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
Find Funding. Review Successful Grants.
Explore over 25,000 new funding opportunities and over 6,000,000 successful grants.
ExploreAdd your recorded webinar
Do you already have a recorded webinar? Grow your audience and get more views by easily listing your recording on Peeref.
Upload Now