Increasing production rate in U-type assembly lines with sequence-dependent set-up times
Published 2016 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
Increasing production rate in U-type assembly lines with sequence-dependent set-up times
Authors
Keywords
-
Journal
ENGINEERING OPTIMIZATION
Volume 49, Issue 8, Pages 1401-1419
Publisher
Informa UK Limited
Online
2016-11-30
DOI
10.1080/0305215x.2016.1256394
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- Balancing stochastic U-lines using particle swarm optimization
- (2016) Emel Kızılkaya Aydoğan et al. JOURNAL OF INTELLIGENT MANUFACTURING
- Fuzzy adaptive genetic algorithm for multi-objective assembly line balancing problems
- (2015) M.H. Alavidoost et al. APPLIED SOFT COMPUTING
- Modified differential evolution algorithm for simple assembly line balancing with a limit on the number of machine types
- (2015) Rapeepan Pitakaso et al. ENGINEERING OPTIMIZATION
- Balancing mixed-model assembly lines with sequence-dependent tasks via hybrid genetic algorithm
- (2015) Qiuhua Tang et al. JOURNAL OF GLOBAL OPTIMIZATION
- Balancing and sequencing of stochastic mixed-model assembly U-lines to minimise the expectation of work overload time
- (2014) Jietao Dong et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Modeling and solving mixed-model assembly line balancing problem with setups. Part II: A multiple colony hybrid bees algorithm
- (2014) Şener Akpinar et al. JOURNAL OF MANUFACTURING SYSTEMS
- A novel integer programming formulation with logic cuts for the U-shaped assembly line balancing problem
- (2013) Ali Fattahi et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Hybridizing ant colony optimization via genetic algorithm for mixed-model assembly line balancing problem with sequence dependent setup times between tasks
- (2012) Sener Akpınar et al. APPLIED SOFT COMPUTING
- A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect
- (2012) Nima Hamta et al. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
- Mixed model U-line balancing type-1 problem: A new approach
- (2012) Masoud Rabbani et al. JOURNAL OF MANUFACTURING SYSTEMS
- The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics
- (2011) Armin Scholl et al. OR SPECTRUM
- A simulated annealing algorithm for balancing the assembly line type II problem with sequence-dependent setup times between tasks
- (2010) S.A. Seyed-Alagheband et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Balancing two-sided assembly lines with sequence-dependent setup times
- (2009) Uğur Özcan et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- A mixed integer linear programming formulation for optimal balancing of mixed-model U-lines
- (2008) Yakup Kara et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
- (2006) Carlos Andrés et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
Discover Peeref hubs
Discuss science. Find collaborators. Network.
Join a conversationCreate your own webinar
Interested in hosting your own webinar? Check the schedule and propose your idea to the Peeref Content Team.
Create Now