Critical Assessment of Contract Administration Using Multidimensional Fuzzy Logic Approach

Journal

Publisher

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)CO.1943-7862.0001975

Keywords

Fuzzy set theory; Project success factors; Project productivity; Project planning; Contract management; Contract administration performance; Project sustainability

Ask authors/readers for more resources

The success of a project depends on investigating the impact of contract administration implementation parameters. A new multidimensional fuzzy model was developed to quantify the performance of construction contract administration processes, which found that change control, financial, and claims and disputes resolution management were the top three groups affecting contract administration performance.
The success of a project depends on the importance of investigating the impact of contract administration implementation parameters such as response time, approval process, resolving issues, coordination, and documentation. To this end, this paper covers the development of a new multidimensional fuzzy model to quantify the performance of construction contract administration (CCA) processes at the project level. The proposed model contains 93 key factors and 11 project management process groups related to contract administration performance. An online questionnaire was used to rate the importance of each factor and group, and 223 responses were collected. The collected data were analyzed for normality, reliability, and intergroup differences. A two-part weighted fuzzy logic model was then developed to measure the CCA performance. The first part represented the group assessment, while the second part assessed the overall performance. The model, which was then implemented in two construction projects in Qatar, illustrated that the proposed model reasonably captured the CCA performance; and thereby a low level of implementing contractual risk management was concluded. The questionnaire results indicated that change control, financial, and claims and disputes resolution management were the top three groups affecting the CCA performance. This study is limited to design-bid-build contracts. Nevertheless, the model might be restudied for other project delivery methods as well.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available