Rescheduling of unrelated parallel machines with job-dependent setup times under forecasted machine breakdown
Published 2020 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
Rescheduling of unrelated parallel machines with job-dependent setup times under forecasted machine breakdown
Authors
Keywords
-
Journal
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume -, Issue -, Pages 1-23
Publisher
Informa UK Limited
Online
2020-06-12
DOI
10.1080/00207543.2020.1775910
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- Rescheduling due to machine disruption to minimize the total weighted completion time
- (2018) Wenchang Luo et al. JOURNAL OF SCHEDULING
- Parallel-machine rescheduling with job unavailability and rejection
- (2018) Dujuan Wang et al. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
- Parallel-machine scheduling with machine-dependent maintenance periodic recycles
- (2017) Guo Li et al. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
- Single-machine scheduling and common due date assignment with potential machine disruption
- (2017) Xiaoyun Xiong et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Rescheduling on identical parallel machines with machine disruptions to minimize total completion time
- (2016) Yunqiang Yin et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Analysis of stochastic local search methods for the unrelated parallel machine scheduling problem
- (2016) Haroldo G. Santos et al. International Transactions in Operational Research
- Multi-objective optimization of parallel machine scheduling integrated with multi-resources preventive maintenance planning
- (2015) Shijin Wang et al. JOURNAL OF MANUFACTURING SYSTEMS
- A knowledge-based evolutionary proactive scheduling approach in the presence of machine breakdown and deterioration effect
- (2015) Du-Juan Wang et al. KNOWLEDGE-BASED SYSTEMS
- Single-machine batch delivery scheduling and common due-date assignment with a rate-modifying activity
- (2014) Yunqiang Yin et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Rescheduling of parallel machines with stochastic processing and setup times
- (2014) Jean-Paul Arnaout JOURNAL OF MANUFACTURING SYSTEMS
- Rescheduling for machine disruption to minimize makespan and maximum lateness
- (2014) Zhixin Liu et al. JOURNAL OF SCHEDULING
- On the identical parallel-machine rescheduling with job rework disruption
- (2013) Le Liu et al. COMPUTERS & INDUSTRIAL ENGINEERING
- Dynamic rescheduling in FMS that is simultaneously considering energy consumption and schedule efficiency
- (2013) Liping Zhang et al. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
- Due-date assignment and single-machine scheduling with generalised position-dependent deteriorating jobs and deteriorating multi-maintenance activities
- (2013) Yunqiang Yin et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Common due date assignment and scheduling with a rate-modifying activity to minimize the due date, earliness, tardiness, holding, and batch delivery cost
- (2012) Yunqiang Yin et al. COMPUTERS & INDUSTRIAL ENGINEERING
- Flow shop rescheduling under different types of disruption
- (2012) Ketrina Katragjini et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times
- (2011) Eva Vallada et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- A simulated annealing algorithm to minimize makespan of parallel batch processing machines with unequal job ready times
- (2011) Purushothaman Damodaran et al. EXPERT SYSTEMS WITH APPLICATIONS
- Production rescheduling for machine breakdown at a job shop
- (2011) Yao-Hsiang Dong et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Using neural network and decision tree for machine reliability prediction
- (2010) Yiyo Kuo et al. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
- A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times
- (2010) H. S. Mirsanei et al. JOURNAL OF INTELLIGENT MANUFACTURING
- The efficient search method of simulated annealing using fuzzy logic controller
- (2008) Suk-Jae Jeong et al. EXPERT SYSTEMS WITH APPLICATIONS
Find Funding. Review Successful Grants.
Explore over 25,000 new funding opportunities and over 6,000,000 successful grants.
ExploreBecome a Peeref-certified reviewer
The Peeref Institute provides free reviewer training that teaches the core competencies of the academic peer review process.
Get Started