Short-term production scheduling with non-triangular sequence-dependent setup times and shifting production bottlenecks
Published 2020 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
Short-term production scheduling with non-triangular sequence-dependent setup times and shifting production bottlenecks
Authors
Keywords
-
Journal
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume -, Issue -, Pages 1-25
Publisher
Informa UK Limited
Online
2020-01-14
DOI
10.1080/00207543.2019.1705420
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- Hybrid algorithm based on improved extended shifting bottleneck procedure and GA for assembly job shop scheduling problem
- (2019) Fei Shi et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Minimising total tardiness for the identical parallel machine scheduling problem with splitting jobs and sequence-dependent setup times
- (2019) Jae-Gon Kim et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- A survey of case studies in production scheduling: Analysis and perspectives
- (2018) Helio Yochihiro Fuchigami et al. Journal of Computational Science
- Changeover formulations for discrete-time mixed-integer programming scheduling models
- (2017) Sara Velez et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- The third comprehensive survey on scheduling problems with setup times/costs
- (2015) Ali Allahverdi EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- An optimization approach for the lot sizing and scheduling problem in the brewery industry
- (2014) Tamara A. Baldo et al. COMPUTERS & INDUSTRIAL ENGINEERING
- A genetic algorithm/mathematical programming approach to solve a two-level soft drink production problem
- (2014) Claudio Fabiano Motta Toledo et al. COMPUTERS & OPERATIONS RESEARCH
- Production lot sizing and scheduling with non-triangular sequence-dependent setup times
- (2014) Alistair Clark et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Comparing models for lot-sizing and scheduling of single-stage continuous processes: Operations research and process systems engineering approaches
- (2013) P. Amorim et al. COMPUTERS & CHEMICAL ENGINEERING
- A modified shifting bottleneck heuristic and disjunctive graph for job shop scheduling problems with transportation constraints
- (2013) Qiao Zhang et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production
- (2011) Deisemara Ferreira et al. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
- Conserving water by optimizing production schedules in the dyeing industry
- (2010) Weili Jiang et al. JOURNAL OF CLEANER PRODUCTION
- SHIFTING PRODUCTION BOTTLENECKS: CAUSES, CURES, AND CONUNDRUMS
- (2010) STEPHEN R. LAWRENCE et al. PRODUCTION AND OPERATIONS MANAGEMENT
- Lot sizing and sequencing optimisation at an animal-feed plant
- (2009) Eli A.V. Toso et al. COMPUTERS & INDUSTRIAL ENGINEERING
- Production setup-sequencing and lot-sizing at an animal nutrition plant through atsp subtour elimination and patching
- (2009) Alistair R. Clark et al. JOURNAL OF SCHEDULING
Publish scientific posters with Peeref
Peeref publishes scientific posters from all research disciplines. Our Diamond Open Access policy means free access to content and no publication fees for authors.
Learn MoreCreate your own webinar
Interested in hosting your own webinar? Check the schedule and propose your idea to the Peeref Content Team.
Create Now