Fault Current Constraint Transmission Expansion Planning Based on the Inverse Matrix Modification Lemma and a Valid Inequality

Journal

ENERGIES
Volume 12, Issue 24, Pages -

Publisher

MDPI
DOI: 10.3390/en12244769

Keywords

Transmission Expansion Planning (TEP); Fault Current Level Constraint; Inverse Matrix Modification Lemma; Valid Inequality

Categories

Funding

  1. Human Resources Program in Energy Technology of the Korea Institute of Energy Technology Evaluation and Planning (KETEP) from the Ministry of Trade, Industry & Energy, Republic of Korea [20174030201770]
  2. Basic Science Research Program through the National Research Foundation of Korea (NRF) - the Ministry of Education [NRF 2019R1I1A3A01059931]
  3. Korea Evaluation Institute of Industrial Technology (KEIT) [20174030201770] Funding Source: Korea Institute of Science & Technology Information (KISTI), National Science & Technology Information Service (NTIS)

Ask authors/readers for more resources

In the transmission expansion planning (TEP) problem, it is challenging to consider a fault current level constraint due to the time-consuming update process of the bus impedance matrix, which is required to calculate the fault currents during the search for the optimal solution. In the existing studies, either a nonlinear update equation or its linearized version is used to calculate the updated bus impedance matrix. In the former case, there is a problem in that the mathematical formulation is derived in the form of mixed-integer nonlinear programming. In the latter case, there is a problem in that an error due to the linearization may exist and the change of fault currents in other buses that are not connected to the new transmission lines cannot be detected. In this paper, we use a method to obtain the exact updated bus impedance matrix directly from the inversion of the bus admittance matrix. We propose a novel method based on the inverse matrix modification lemma (IMML) and a valid inequality is proposed to find a better solution to the TEP problem with fault current level constraint. The proposed method is applied to the IEEE two-area reliability test system with 96 buses to verify the performance and effectiveness of the proposed method and we compare the results with the existing methods. Simulation results show that the existing TEP method based on impedance matrix modification method violates the fault current level constraint in some buses, while the proposed method satisfies the constraint in all buses in a reasonable computation time.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available