A two-stage flow-shop scheduling problem with incompatible job families and limited waiting time

Title
A two-stage flow-shop scheduling problem with incompatible job families and limited waiting time
Authors
Keywords
-
Journal
ENGINEERING OPTIMIZATION
Volume -, Issue -, Pages 1-23
Publisher
Informa UK Limited
Online
2019-05-17
DOI
10.1080/0305215x.2019.1593974

Ask authors/readers for more resources

Discover Peeref hubs

Discuss science. Find collaborators. Network.

Join a conversation

Become a Peeref-certified reviewer

The Peeref Institute provides free reviewer training that teaches the core competencies of the academic peer review process.

Get Started