Green permutation flowshop scheduling problem with sequence-dependent setup times: a case study
Published 2019 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
Green permutation flowshop scheduling problem with sequence-dependent setup times: a case study
Authors
Keywords
-
Journal
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume -, Issue -, Pages 1-23
Publisher
Informa UK Limited
Online
2019-02-23
DOI
10.1080/00207543.2019.1581955
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- A memetic differential evolution algorithm for energy-efficient parallel machine scheduling
- (2018) Xueqi Wu et al. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
- Mathematical modelling and optimisation of energy-conscious hybrid flow shop scheduling problem with unrelated parallel machines
- (2018) Leilei Meng et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- MILP models for energy-aware flexible job shop scheduling problem
- (2018) Leilei Meng et al. JOURNAL OF CLEANER PRODUCTION
- Flow shop scheduling with grid-integrated onsite wind power using stochastic MILP
- (2017) Konstantin Biel et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Production scheduling optimisation with machine state and time-dependent energy costs
- (2017) MohammadMohsen Aghelinejad et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Energy-efficient permutation flow shop scheduling problem using a hybrid multi-objective backtracking search algorithm
- (2017) Chao Lu et al. JOURNAL OF CLEANER PRODUCTION
- Energy, economy, and environment analysis and optimization on manufacturing plant energy supply system
- (2016) Lujia Feng et al. ENERGY CONVERSION AND MANAGEMENT
- Green scheduling of a two-machine flowshop: Trade-off between makespan and energy consumption
- (2016) S. Afshin Mansouri et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Carbon-efficient scheduling of flow shops by multi-objective optimization
- (2016) Jian-Ya Ding et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Energy-efficient scheduling in manufacturing companies: A review and research framework
- (2016) Christian Gahm et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- A multi-objective genetic algorithm for optimisation of energy consumption and shop floor production performance
- (2016) Ying Liu et al. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
- Solving the energy-efficient job shop scheduling problem: a multi-objective genetic algorithm with enhanced local search for minimizing the total weighted tardiness and total energy consumption
- (2016) Rui Zhang et al. JOURNAL OF CLEANER PRODUCTION
- Parallel machine scheduling problems in green manufacturing industry
- (2016) Kai Li et al. JOURNAL OF MANUFACTURING SYSTEMS
- Minimizing energy consumption and makespan in a two-machine flowshop scheduling problem
- (2016) S Afshin Mansouri et al. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
- Comparative analysis of carbon dioxide emission factors for energy industries in European Union countries
- (2015) Inga Konstantinaviciute et al. RENEWABLE & SUSTAINABLE ENERGY REVIEWS
- Energy-conscious flow shop scheduling under time-of-use electricity tariffs
- (2014) Hao Zhang et al. CIRP ANNALS-MANUFACTURING TECHNOLOGY
- Flow shop scheduling with peak power consumption constraints
- (2013) Kan Fang et al. ANNALS OF OPERATIONS RESEARCH
- Reduction of power consumption and carbon footprints by applying multi-objective optimisation via genetic algorithms
- (2013) Cheng-Hsiang Liu et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm
- (2013) Min Dai et al. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING
- A study on energy efficiency improvement for machine tools
- (2011) M. Mori et al. CIRP ANNALS-MANUFACTURING TECHNOLOGY
- A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction
- (2011) Kan Fang et al. JOURNAL OF MANUFACTURING SYSTEMS
- A bicriteria m-machine flowshop scheduling with sequence-dependent setup times
- (2009) Tamer Eren APPLIED MATHEMATICAL MODELLING
- Effective implementation of the ε-constraint method in Multi-Objective Mathematical Programming problems
- (2009) George Mavrotas APPLIED MATHEMATICS AND COMPUTATION
- An Iterated Greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives
- (2006) Rubén Ruiz et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
Discover Peeref hubs
Discuss science. Find collaborators. Network.
Join a conversationPublish scientific posters with Peeref
Peeref publishes scientific posters from all research disciplines. Our Diamond Open Access policy means free access to content and no publication fees for authors.
Learn More