Multi-objective model for optimizing railway infrastructure asset renewal
Published 2018 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
Multi-objective model for optimizing railway infrastructure asset renewal
Authors
Keywords
-
Journal
ENGINEERING OPTIMIZATION
Volume -, Issue -, Pages 1-17
Publisher
Informa UK Limited
Online
2018-12-07
DOI
10.1080/0305215x.2018.1547716
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- A Customized Hybrid Approach to Infrastructure Maintenance Scheduling in Railroad Networks under Variable Productivities
- (2018) Siyang Xie et al. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING
- A hybrid Constraint Programming/Mixed Integer Programming framework for the preventive signaling maintenance crew scheduling problem
- (2018) Shahrzad M. Pour et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Multiobjective Optimization for Railway Maintenance Plans
- (2018) Daniel Peralta et al. JOURNAL OF COMPUTING IN CIVIL ENGINEERING
- Joint optimization of logistics infrastructure investments and subsidies in a regional logistics network with CO 2 emission reduction targets
- (2018) Dezhi Zhang et al. TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT
- Maintenance Scheduling for Railway Tracks under Limited Possession Time
- (2018) Cuong Dao et al. Journal of Transportation Engineering Part A-Systems
- Tamping and Renewal Optimization of Ballasted Track Using Track Measurement Data and Genetic Algorithm
- (2018) Jun S. Lee et al. Journal of Transportation Engineering Part A-Systems
- Optimal Scheduling of Railway Track Possessions in Large-Scale Projects with Multiple Construction Works
- (2017) Rui Li et al. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
- Selection of maintenance, renewal and improvement projects in rail lines using the analytic network process
- (2017) Jesús Montesinos-Valera et al. Structure and Infrastructure Engineering
- An analysis of rail freight operational efficiency and mode share in the British port-hinterland container market
- (2017) Allan Woodburn TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT
- Optimal Scheduling of Railway Track Possessions in Large-Scale Projects with Multiple Construction Works
- (2017) Rui Li et al. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
- Sustainable Decision-Making in Civil Engineering, Construction and Building Technology
- (2017) Edmundas Zavadskas et al. Sustainability
- Railway Maintenance Management Using a Stochastic Geometrical Degradation Model
- (2017) Amir Hossein Eslami Khouzani et al. Journal of Transportation Engineering Part A-Systems
- Bi-objective Modeling Approach for Repairing Multiple Feature Infrastructure Systems
- (2016) Nuno Sousa et al. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING
- Optimization of preventive condition-based tamping for railway tracks
- (2016) M. Wen et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Strategic Model to Optimize Railway-Track Renewal Operations at a Network Level
- (2016) Luis Filipe Caetano et al. Journal of Infrastructure Systems
- New heuristics for the Stochastic Tactical Railway Maintenance Problem
- (2016) Mauro M. Baldi et al. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
- Rail maintenance analysis using Petri nets
- (2016) Di Zhang et al. Structure and Infrastructure Engineering
- Infrastructure maintenance, regeneration and service quality economics: A rail example
- (2016) Marc Gaudry et al. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL
- Optimisation model to schedule railway track renewal operations: a life-cycle cost approach
- (2014) Luis Filipe Caetano et al. Structure and Infrastructure Engineering
- Optimal Clustering of Railroad Track Maintenance Jobs
- (2013) Fan Peng et al. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING
- Availability Approach to Optimizing Railway Track Renewal Operations
- (2013) Luis Filipe Caetano et al. JOURNAL OF TRANSPORTATION ENGINEERING
- Investigating railway track asset management using a Markov analysis
- (2013) Darren Prescott et al. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT
- A review of multi-criteria decision-making methods for infrastructure management
- (2013) Golam Kabir et al. Structure and Infrastructure Engineering
- Geographic information system-based railway maintenance and renewal system
- (2012) Hakan Guler PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-TRANSPORT
- Track maintenance production team scheduling in railroad networks
- (2012) Fan Peng et al. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL
- Optimal threshold-based network-level transportation infrastructure life-cycle management with heterogeneous maintenance actions
- (2012) James C. Chu et al. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL
- Biobjective Optimization Model for Maintenance and Renewal Decisions Related to Rail Track Geometry
- (2012) A. Ramos Andrade et al. TRANSPORTATION RESEARCH RECORD
- Determining an Optimal Maintenance Period for Infrastructure Systems
- (2011) Xueqing Zhang et al. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING
- Establishing optimal project-level strategies for pavement maintenance and rehabilitation – A framework and case study
- (2011) Muhammad Irfan et al. ENGINEERING OPTIMIZATION
- Integer Programming to Optimize Tamping in Railway Tracks as Preventive Maintenance
- (2011) Cecília Vale et al. JOURNAL OF TRANSPORTATION ENGINEERING
- A Heuristic Approach to the Railroad Track Maintenance Scheduling Problem
- (2010) Fan Peng et al. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING
- A new multi-objective optimization model for preventive maintenance and replacement scheduling of multi-component systems
- (2010) Kamran S. Moghaddam et al. ENGINEERING OPTIMIZATION
- State of the art for European track maintenance and renewal logistics
- (2010) C J Bouch et al. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT
- A genetic-algorithm-based approach for scheduling the renewal of railway track components
- (2009) J Zhao et al. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT
- Cost-effective selection and multi-period scheduling of pavement maintenance and rehabilitation strategies
- (2008) J. Yoo et al. ENGINEERING OPTIMIZATION
Find Funding. Review Successful Grants.
Explore over 25,000 new funding opportunities and over 6,000,000 successful grants.
ExploreBecome a Peeref-certified reviewer
The Peeref Institute provides free reviewer training that teaches the core competencies of the academic peer review process.
Get Started