Simulated imperialist competitive algorithm in two-stage assembly flow shop with machine breakdowns and preventive maintenance
Published 2015 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
Simulated imperialist competitive algorithm in two-stage assembly flow shop with machine breakdowns and preventive maintenance
Authors
Keywords
-
Journal
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE
Volume 230, Issue 5, Pages 934-953
Publisher
SAGE Publications
Online
2015-02-19
DOI
10.1177/0954405414563554
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance
- (2014) Rachid Benmansour et al. COMPUTERS & OPERATIONS RESEARCH
- A hybrid electromagnetism-like algorithm for two-stage assembly flow shop scheduling problem
- (2014) Hong-Sen Yan et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Meta-heuristics for the distributed two-stage assembly scheduling problem with bi-criteria of makespan and mean completion time
- (2014) Fuli Xiong et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities
- (2013) Jun-Qing Li et al. APPLIED MATHEMATICAL MODELLING
- Multi-objective preventive maintenance and replacement scheduling in a manufacturing system using goal programming
- (2013) Kamran S. Moghaddam INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
- Two-stage assembly flow-shop scheduling problem with non-identical assembly machines considering setup times
- (2013) A. Mozdgir et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- An efficient imperialist competitive algorithm for scheduling in the two-stage assembly flow shop problem
- (2013) Hany Seidgar et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Hybrid Evolutionary Algorithm for job scheduling under machine maintenance
- (2012) Ruhul Sarker et al. APPLIED SOFT COMPUTING
- Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints
- (2012) Vahid Majazi Dalfard et al. COMPUTERS & MATHEMATICS WITH APPLICATIONS
- A reliability/availability approach to joint production and maintenance scheduling with multiple preventive maintenance services
- (2012) Hadi Mokhtari et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Scheduling stochastic job shop subject to random breakdown to minimize makespan
- (2011) Deming Lei INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
- Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm
- (2011) Nasr Al-Hinai et al. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
- Production rescheduling for machine breakdown at a job shop
- (2011) Yao-Hsiang Dong et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence
- (2011) F J Hwang et al. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
- Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop
- (2010) E. Torabzadeh et al. ADVANCES IN ENGINEERING SOFTWARE
- Incorporating periodic preventive maintenance into flexible flowshop scheduling problems
- (2010) B. Naderi et al. APPLIED SOFT COMPUTING
- Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
- (2010) E. Moradi et al. EXPERT SYSTEMS WITH APPLICATIONS
- A genetic algorithm for JIT single machine scheduling with preemption and machine idle time
- (2010) H. Khorshidian et al. EXPERT SYSTEMS WITH APPLICATIONS
- A hybrid method for flowshops scheduling with condition-based maintenance constraint and machines breakdown
- (2010) Ehram Safari et al. EXPERT SYSTEMS WITH APPLICATIONS
- A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem
- (2010) E. Shokrollahpour et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Hybrid flexible flowshops with sequence-dependent setup times and machine availability constraints
- (2009) F. Jabbarizadeh et al. COMPUTERS & INDUSTRIAL ENGINEERING
- Analysis of robustness in proactive scheduling: A graphical approach
- (2009) Feiza Ghezail et al. COMPUTERS & INDUSTRIAL ENGINEERING
- Multi-objective scheduling of dynamic job shop using variable neighborhood search
- (2009) M.A. Adibi et al. EXPERT SYSTEMS WITH APPLICATIONS
- Dynamic job shop scheduling using variable neighbourhood search
- (2009) M. Zandieh et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- The two-stage assembly scheduling problem to minimize total completion time with setup times
- (2008) Ali Allahverdi et al. COMPUTERS & OPERATIONS RESEARCH
- Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns
- (2008) M. Gholami et al. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
- An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns
- (2008) M. Zandieh et al. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
- Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem
- (2008) A. Berrichi et al. JOURNAL OF INTELLIGENT MANUFACTURING
Find Funding. Review Successful Grants.
Explore over 25,000 new funding opportunities and over 6,000,000 successful grants.
ExploreCreate your own webinar
Interested in hosting your own webinar? Check the schedule and propose your idea to the Peeref Content Team.
Create Now