A review of methods and algorithms for optimizing construction scheduling
Published 2013 View Full Article
- Home
- Publications
- Publication Search
- Publication Details
Title
A review of methods and algorithms for optimizing construction scheduling
Authors
Keywords
algorithm, construction, optimization, scheduling
Journal
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
Volume 64, Issue 8, Pages 1091-1105
Publisher
Informa UK Limited
Online
2013-03-13
DOI
10.1057/jors.2012.174
References
Ask authors/readers for more resources
Related references
Note: Only part of the references are listed.- Augmented heuristic algorithm for multi-skilled resource scheduling
- (2011) Narongrit Wongwai et al. AUTOMATION IN CONSTRUCTION
- Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow
- (2010) Shu-Shun Liu et al. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
- Comparing Schedule Generation Schemes in Resource-Constrained Project Scheduling Using Elitist Genetic Algorithm
- (2010) Jin-Lee Kim et al. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
- A new exact penalty function method for continuous inequality constrained optimization problems
- (2010) Changjun Yu et al. Journal of Industrial and Management Optimization
- Project Scheduling-Theory and Practice
- (2010) Willy Herroelen PRODUCTION AND OPERATIONS MANAGEMENT
- A genetic algorithm-based method for scheduling repetitive construction projects
- (2009) Luong Duc Long et al. AUTOMATION IN CONSTRUCTION
- A survey of variants and extensions of the resource-constrained project scheduling problem
- (2009) Sönke Hartmann et al. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
- Intelligent optimization for project scheduling of the first mining face in coal mining
- (2009) Haixiang Guo et al. EXPERT SYSTEMS WITH APPLICATIONS
- Nondominated Archiving Multicolony Ant Algorithm in Time–Cost Trade-Off Optimization
- (2009) A. Afshar et al. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
- Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling
- (2008) Magdalena Rogalska et al. AUTOMATION IN CONSTRUCTION
- A two-phase GA model for resource-constrained project scheduling
- (2008) Po-Han Chen et al. AUTOMATION IN CONSTRUCTION
- Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints
- (2008) Po-Han Chen et al. AUTOMATION IN CONSTRUCTION
- Optimizing Construction Time and Cost Using Ant Colony Optimization Approach
- (2008) S. Thomas Ng et al. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
- Permutation-Based Elitist Genetic Algorithm for Optimization of Large-Sized Resource-Constrained Project Scheduling
- (2008) Jin-Lee Kim et al. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
Find Funding. Review Successful Grants.
Explore over 25,000 new funding opportunities and over 6,000,000 successful grants.
ExploreBecome a Peeref-certified reviewer
The Peeref Institute provides free reviewer training that teaches the core competencies of the academic peer review process.
Get Started