4.5 Article

Verification of Incremental Launching Construction Safety for the Ilsun Bridge, the World's Longest and Widest Prestressed Concrete Box Girder with Corrugated Steel Web Section

Journal

JOURNAL OF BRIDGE ENGINEERING
Volume 16, Issue 3, Pages 453-460

Publisher

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)BE.1943-5592.0000165

Keywords

Bridges, box girder; Prestressed concrete; Webs, structural; Shear stress; Optimization; Construction management; Safety; Korea, South

Funding

  1. Ministry of Construction and Transportation of the Korean government [05, C14]
  2. Korea Agency for Infrastructure Technology Advancement (KAIA) [05건설핵심C14] Funding Source: Korea Institute of Science & Technology Information (KISTI), National Science & Technology Information Service (NTIS)
  3. National Research Foundation of Korea [과C6A1704] Funding Source: Korea Institute of Science & Technology Information (KISTI), National Science & Technology Information Service (NTIS)

Ask authors/readers for more resources

The Ilsun Bridge is the world's longest (801 m in total length) and widest (30.9 m in maximum width) prestressed concrete box girder bridge incorporating a corrugated steel web. This bridge has fourteen spans, twelve of which were erected using an incremental launching method, a method that is rarely applied in this type of bridge. To verify the construction safety of the Ilsun Bridge, this investigation focuses on the span-to-depth ratio, buckling shear stress of the corrugated steel webs, optimization of the length of the steel launching nose, detailed construction stage analysis, and the stress level endured by the corrugated steel webs during the launching process. The span-to-depth ratio of the Ilsun Bridge was found to be well-designed, using a conservative corrugated steel web design. Further, our investigation revealed that the conventional nose-deck interaction equation was not suitable for corrugated steel web bridges. As a result, a detailed construction stage analysis and measurements of this bridge was performed to examine stress levels and ensure safety during the erection process. The results revealed that there are essential design issues that should be considered when designing prestressed concrete box girder bridges with corrugated steel webs and that, when constructing them, the incremental launching method should be used. DOI:10.1061/(ASCE)BE.1943-5592.0000165. (C) 2011 American Society of Civil Engineers.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.5
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available