Scheduling and co-ordination of multi-suppliers single-warehouse-operator single-manufacturer supply chains with variable production rates and storage costs

Journal

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume 51, Issue 9, Pages 2593-2601

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2012.737949

Keywords

flow shop scheduling; production rate; storage cost; supply chain co-ordination

Funding

  1. RGC [PolyU 5424/11H]

Ask authors/readers for more resources

We study a supply chain scheduling and co-ordination problem comprising multiple suppliers, a single warehouse operator, a single manufacturer, and multiple retailers, where the supply chain has limited production capacity that can take only some of the orders from the retailers. For a decentralised supply chain, the manufacturer is a decision maker that selects the orders and aims to maximise its own profit, where the profit is a function of the order storage time and storage quantity, order sequence-dependent weighted storage costs, and idle time of the orders. On the other hand, for a centralised supply chain, a supply chain co-ordinator exists that aims to maximise the profit of the whole supply chain and allocates the profit among the supply chain members. We first formulate the problem as a two-machine common-due-window flow shop scheduling problem. We then develop a theorem and two algorithms to solve the optimal scheduling problems in both the decentralised and centralised supply chains. With these results, we develop a method that can achieve channel co-ordination based on a profit sharing rule, together with an increase in the production rates and a decrease in the storage costs.

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available