4.7 Article

Uncapacitated lot-sizing problem with production time windows, early productions, backlogs and lost sales

Journal

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume 49, Issue 9, Pages 2551-2566

Publisher

TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2010.532920

Keywords

lot-sizing; dynamic programming; production time windows; lost sale; early production; backlog

Ask authors/readers for more resources

We consider the single item uncapacitated lot-sizing problem with production time windows, lost sales, early productions and backlogs over a planning horizon of T periods. In this context, a demand not processed within its time window can either be lost (lost sale), satisfied from a production that is processed before the release period of the demand (early production) or satisfied from a production that occurs after the demand due period (backlog). We present several properties of the optimal solution for different variants of the problem when production time windows are non-customer specific. We propose dynamic programming algorithms to solve the examined problems in O(T2).

Authors

I am an author on this paper
Click your name to claim this paper and add it to your profile.

Reviews

Primary Rating

4.7
Not enough ratings

Secondary Ratings

Novelty
-
Significance
-
Scientific rigor
-
Rate this paper

Recommended

No Data Available
No Data Available